Remanufacturing lot-sizing under alternative perceptions of returned units' quality
暂无分享,去创建一个
[1] Peter Hills,et al. Industry responses to EU WEEE and ROHS directives: Perspectives from China , 2006 .
[2] J. C. Hayya,et al. The (s, Q) inventory model with Erlang lead time and deterministic demand , 2004 .
[3] Jack C. Hayya,et al. An Inventory Model with Order Crossover , 1998, Oper. Res..
[4] Gilbert Laporte,et al. The vehicle routing problem: An overview of exact and approximate algorithms , 1992 .
[5] Vedat Verter,et al. Investing in reusability of products of uncertain remanufacturing cost: The role of inspection capabilities , 2012 .
[6] Sophie N. Parragh,et al. A survey on pickup and delivery problems Part I : Transportation between customers and depot , 2007 .
[7] M. I. Vidalis,et al. Markovian analysis of production lines with Coxian-2 service times , 1999 .
[8] K.L. Mak,et al. A genetic algorithm for vehicle routing problems with stochastic demand and soft time windows , 2004, Proceedings of the 2004 IEEE Systems and Information Engineering Design Symposium, 2004..
[9] A. E. Eiben,et al. Introduction to Evolutionary Computing , 2003, Natural Computing Series.
[10] Erwin van der Laan,et al. Leadtime effects and policy improvement for stochastic inventory control with remanufacturing , 2001 .
[11] Barış Tan. A three-station merge system with unreliable stations and a shared buffer , 2001 .
[12] Priya Nandita Pooran. Global Financial Crisis , 2010 .
[13] H. Tijms. A First Course in Stochastic Models , 2003 .
[14] Ruiyou Zhang,et al. Heuristic-based truck scheduling for inland container transportation , 2010, OR Spectr..
[15] H. T. Papadopoulos,et al. A recursive algorithm for generating the transition matrices of multistation multiserver exponential reliable queueing networks , 2001, Comput. Oper. Res..
[16] D. Huisingh,et al. Remanufacturing for the automotive aftermarket-strategic factors: literature review and future research needs , 2009 .
[17] F. Cruz,et al. The buffer allocation problem for general finite buffer queueing networks , 2005 .
[18] C. T. Papadopoulos,et al. Markovian analysis of a discrete material manufacturing system with merge operations, operation-dependent and idleness failures , 2006, Comput. Ind. Eng..
[19] Harry G. Perros,et al. Open Networks of Queues with Blocking: Split and Merge Configurations: , 1986 .
[20] T. Manios,et al. End of life vehicle management in areas of low technology sophistication. A case study in Greece , 2003 .
[21] Walter Ukovich,et al. Minimizing fleet operating costs for a container transportation company , 2006, Eur. J. Oper. Res..
[22] Krishan Rana,et al. An Optimization Approach , 2004 .
[23] Steven H. Low,et al. An optimization approach to ABR control , 1998, ICC '98. 1998 IEEE International Conference on Communications. Conference Record. Affiliated with SUPERCOMM'98 (Cat. No.98CH36220).
[24] Ronald S. Tibben-Lembke,et al. Going Backwards: Reverse Logistics Trends and Practices , 1999 .
[25] R. W. Grubbström,et al. Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns , 2005 .
[26] M. N. Gopalan,et al. On the transient behaviour of a merge production system with an end buffer , 1994 .
[27] Hyo-Seong Lee,et al. Approximate analysis for the merge configuration of an open queueing network with blocking , 1989 .
[28] Tamer Boyacı,et al. The effect of categorizing returned products in remanufacturing , 2004 .
[29] Martin Spring,et al. Third party logistics : a literature review and research agenda , 2007 .
[30] C. K. Mohan,et al. Evolving schedule graphs for the vehicle routing problem with time windows , 2000, Proceedings of the 2000 Congress on Evolutionary Computation. CEC00 (Cat. No.00TH8512).
[31] Georghios P. Sphicas,et al. Technical Note - On the Solution of an Inventory Model with Variable Lead Times , 1982, Oper. Res..
[32] Penousal Machado,et al. Vehicle Routing Problem: Doing It The Evolutionary Way , 2002, GECCO.
[33] M. Christopher. Logistics & Supply Chain Management , 1998 .
[34] Rommert Dekker,et al. Determination of recovery effort for a probabilistic recovery system under various inventory control policies , 2004 .
[35] Ningjian Huang,et al. Modelling and analysis of a multiple product manufacturing system with split and merge , 2005 .
[36] M. Sol. The general pickup and delivery problem , 2010 .
[37] Dorotea López Giral,et al. "The collapse of global trade, murky protectionism, and the crisis: recommendations for the G20": Richard Baldwin y Simon Evenett (eds.), vers. digital , 2009 .
[38] Margaret A. Peteraf,et al. GETTING TO KNOW YOU: A THEORY OF STRATEGIC GROUP IDENTITY , 1997, Strategic Management Journal.
[39] Enrique Alba,et al. Solving the Vehicle Routing Problem by Using Cellular Genetic Algorithms , 2004, EvoCOP.
[40] Cathy Macharis,et al. Opportunities for OR in intermodal freight transport research: A review , 2004, Eur. J. Oper. Res..
[41] Petros A. Ioannou,et al. CONTAINER MOVEMENT BY TRUCKS IN METROPOLITAN NETWORKS: MODELING AND OPTIMIZATION , 2005 .
[42] John McGee,et al. A LONGITUDINAL STUDY OF THE COMPETITIVE POSITIONS AND ENTRY PATHS OF EUROPEAN FIRMS IN THE U.S. PHARMACEUTICAL MARKET , 1996 .
[43] DaeSoo Kim,et al. Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return , 2012 .
[44] Eleftherios Iakovou,et al. A planning optimisation framework for construction and demolition waste management , 2012 .
[45] Yang Liu,et al. Split and merge production systems: performance analysis and structural properties , 2010 .
[46] H. T. Papadopoulos,et al. A recursive algorithm for generating the transition matrices of multistation series production lines , 1989 .
[47] Matthew J. Liberatore,et al. Technical Note - The EOQ Model under Stochastic Lead Time , 1979, Oper. Res..
[48] M. Javad Paknejad,et al. Lead-time variability reduction in stochastic inventory models , 1992 .
[49] Amelia C. Regan,et al. Local truckload pickup and delivery with hard time window constraints , 2002 .
[50] Paulina Golinska,et al. Remanufacturing in automotive industry: Challenges and limitations , 2011 .
[51] H. T. Papadopoulos,et al. Throughput rate of multistation reliable production lines with inter station buffers. (I) Exponential case , 1989 .
[52] Christos Zikopoulos,et al. On the effect of quality overestimation in remanufacturing , 2010 .
[53] M. Hariga,et al. Integrated single vendor single buyer model with stochastic demand and variable lead time , 2004 .
[54] Elif Akçali,et al. Quantitative models for inventory and production planning in closed-loop supply chains , 2011 .
[55] Akif Asil Bulgak,et al. Analysis and design of split and merge unpaced assembly systems by metamodelling and stochastic search , 2006 .
[56] Philipp Nagl. Longer Combination Vehicles (LCV) for Asia and the Pacific Region: Some Economic Implications , 2007 .
[57] Jane Yung-jen Hsu,et al. A Family Competition Genetic Algorithm for the Pickup and Delivery Problems with Time Window , 2006 .
[58] Pantelis Longinidis,et al. The logistics services outsourcing dilemma: quality management and financial performance perspectives , 2010 .
[59] Mikhail Ershov,et al. Global Financial Crisis: A Year Later , 2009 .
[60] Haw‐Jan Wu,et al. Environmentally responsible logistics systems , 1995 .
[61] Stefan Helber,et al. Decomposition of unreliable assembly/disassembly networks with limited buffer capacity and random processing times , 1998, Eur. J. Oper. Res..
[62] Richard F. Hartl,et al. A survey on pickup and delivery problems , 2008 .
[63] Rommert Dekker,et al. An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies , 1999, Eur. J. Oper. Res..
[64] M. I. Vidalis,et al. Exact analysis of a discrete material three-station one-buffer merge system with unreliable machines , 2004 .
[65] Stefan Helber,et al. Exact Analysis of a Continuous Material Merge System with Limited Buffer Capacity and Three Stations , 2003 .
[66] K. Butner. The smarter supply chain of the future , 2010 .
[67] Michel Gendreau,et al. Metaheuristics for the Vehicle Routing Problem and Its Extensions: A Categorized Bibliography , 2008 .
[68] Stanley B. Gershwin,et al. Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer , 2009 .
[69] Kenneth de Jong,et al. Evolutionary computation: a unified approach , 2007, GECCO.
[70] Vikram Bhakoo,et al. Adding Value through Outsourcing: Contribution of 3PL Services to Customer Performance , 2007 .
[71] H. Thomas,et al. Strategic Groups: Theory, Research and Taxonomy , 1986 .
[72] M. D. Brito,et al. Managing reverse logistics or reversing logistics management , 2004 .
[73] Michael L. Mussa. Global Economic Prospects , 2002 .
[74] Lai Ming-yong,et al. An improved differential evolution algorithm for vehicle routing problem with simultaneous pickups and deliveries and time windows , 2010, Eng. Appl. Artif. Intell..
[75] Marc Salomon,et al. Strategic Issues in Product Recovery Management , 1995 .
[76] Mohamad Y. Jaber,et al. Lot sizing for a recoverable product with inspection and sorting , 2010, Comput. Ind. Eng..
[77] Rob A. Zuidwijk,et al. Strategic response to EEE returns: : Product eco-design or new recovery processes? , 2008, Eur. J. Oper. Res..
[78] R. Dekker,et al. Inventory control policies for inspection and remanufacturing of returns: A case study , 2010 .
[79] David F. Pyke,et al. Periodic review, push inventory policies for remanufacturing , 2002, Eur. J. Oper. Res..
[80] Richard F. Hartl,et al. A survey on pickup and delivery problems , 2008 .
[81] Stefan Helber,et al. Performance Analysis of Flow Lines with Non-Linear Flow of Material , 1999 .
[82] M. N. Gopalan,et al. On the Production Rate of a Merge Production System , 1994 .
[83] Christos Zikopoulos,et al. Optimal location and value of timely sorting of used items in a remanufacturing supply chain with multiple collection sites , 2008 .
[84] W. Shaw,et al. Global economic prospects 2010 : crisis, finance, and growth , 2010 .
[85] Ruud H. Teunter,et al. Optimal core acquisition and remanufacturing policies under uncertain core quality fractions , 2011, Eur. J. Oper. Res..
[86] Milorad Vidovic,et al. Vehicle Routing in Containers Pickup Up and Delivery Processes , 2011 .
[87] Alan L. Erera,et al. Planning local container drayage operations given a port access appointment system , 2008 .
[88] Stefan Helber,et al. A New Decomposition Approach for Non-Cyclic Continuous Material Flow Lines with a Merging Flow of Material , 2004, Ann. Oper. Res..
[89] C. Carter,et al. REVERSE LOGISTICS: A REVIEW OF THE LITERATURE AND FRAMEWORK FOR FUTURE INVESTIGATION , 1998 .
[90] Mark Ferguson,et al. The Value of Quality Grading in Remanufacturing , 2009 .
[91] Erwin van der Laan,et al. Quantitative models for reverse logistics: A review , 1997 .
[92] Ningjian Huang,et al. Modeling and analysis of a multiple product manufacturing system with split and merge , 2004, IEEE International Conference on Robotics and Automation, 2004. Proceedings. ICRA '04. 2004.
[93] Mary Louise Hatten,et al. Strategic groups, asymmetrical mobility barriers and contestability , 1987 .