USING CONTROL CHARTS TO MEASURE SYSTEMS ENGINEERING EFFECTIVENESS

A methodology for selecting metrics to measure the long term performance of a systems engineering organization is outlined. When appropriate, control charts are used to enable the organization to perform plan, do, study, act cycles to determine if changes to operations improved the mean and variation in performance. Illustrative examples are presented using data from an aerospace firm's systems engineering department.