Beam Commissioning Status and Results of the FNAL PIP2IT Linear Accelerator RFQ
暂无分享,去创建一个
John Staples | M. Hoff | Curtis Baffes | Tianhuan Luo | Andrew Lambert | Derun Li | Steve Virostek | V. Scarpine | A. L. Edelen | P.Berrutti | J. Steimel | Timergali Khabiboulline | Alexander Shemyakin | Jonathan Edelen | V. Scarpine | A. Lambert | M. Hoff | S. Virostek | T. Luo | J. Staples | C. Baffes | Derun Li | J. Carneiro | Lionel Prost | V. Sista | L. Prost | J. P. Carneiro | V. Lalitha Sista | A. Shemyakin | A. Edelen | J. Edelen | T. Khabiboulline | J. Steimel
[1] V.Poloubotko,et al. DESIGN OF RFQ COUPLER FOR PXIE PROJECT , 2013 .
[2] William Pellico,et al. FNAL - The Proton Improvement Plan (PIP) , 2014 .
[3] M. Goodman,et al. The Deep Underground Neutrino Experiment , 2015 .
[4] D.Li,et al. RF, THERMAL, AND STRUCTURAL FINITE ELEMENT ANALYSIS OF THE PROJECT X INJECTOR EXPERIMENT (PXIE)* CW RADIOWEPMA20 FREQUENCY QUADRUPOLE (RFQ) , 2013 .
[5] S. Brice. Proton Improvement Plan II: An 800 MeV Superconducting Linac to Support Megawatt Proton Beams at Fermilab , 2016 .
[6] V. Scarpine,et al. BEAM POSITION MONITORING SYSTEM FOR THE PIP-II INJECTOR TEST ACCELERATOR , 2016 .
[7] N. Solyak,et al. Project X Injector Experiment: Goals, plan and status , 2013 .
[8] S.P.Virostek,et al. FINAL DESIGN OF A CW RADIO-FREQUENCY QUADRUPOLE (RFQ) FOR THE PROJECT X INJECTOR EXPERIMENT (PXIE) , 2013 .