CONCURRENT PROJECT SCHEDULING AND MATERIAL PLANNING: A GENETIC ALGORITHM APPROACH
暂无分享,去创建一个
[1] Thomas G. Schmitt,et al. Scheduling recurrent construction , 2004 .
[2] A. A. Elimam,et al. Integrated Project Scheduling and Material Planning with Variable Activity Duration and Rewards , 1996 .
[3] Harvey M. Wagner,et al. Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..
[4] A Erbasi,et al. A modified heuristic procedure for materials management in project networks , 1999 .
[5] Rainer Kolisch,et al. Characterization and generation of a general class of resource-constrained project scheduling problems , 1995 .
[6] Dwight E. Smith-Daniels,et al. Optimal Project Scheduling with Materials Ordering , 1987 .
[7] N. J. Aquilano,et al. A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning , 1980 .
[8] B. DOD1N,et al. Integrated project scheduling and material planning with variable activity duration and rewards , 2001 .
[9] Arnaud Fréville,et al. The multidimensional 0-1 knapsack problem: An overview , 2004, Eur. J. Oper. Res..
[10] Dwight E. Smith-Daniels,et al. Constrained resource project scheduling subject to material constraints , 1984 .