Quality Control for Embankment of Rockfill Dam with Asphalt Concrete Core at Yele Hydropower Station
暂无分享,去创建一个
From point view of supervision , scientific quality assurance system is established based on characteristics of rockfill dam with asphalt concrete core at Yele hydropower station , such as various embankment materials , large volume embankment with high intensity , various working procedures , severe interference at intersectional construction sites and complex technical problems . At the same time , practical and operable quality control procedure , measures and m-site control method are made to ensure construction quality of dam embankment .