Influence of the parameters of fitness function for the periods set selection in elastic task model scheduling

Elastic task model scheduling allows to ensure reliability condition for node that has aperiodic and periodic tasks changing their timing parameters. In this model heuristic algorithms seek and evaluate new periods of tasks with fitness function. This paper presents the results of simulation studies validate the developed fitness functions.

[1]  Anton Cervin,et al.  Feedback scheduling of control tasks , 2000, Proceedings of the 39th IEEE Conference on Decision and Control (Cat. No.00CH37187).

[2]  Jacek Blazewicz,et al.  Preemptable malleable task scheduling problem , 2006, IEEE Transactions on Computers.

[3]  Adam Janiak,et al.  Single processor scheduling with job values depending on their completion times , 2007, J. Sched..

[4]  P. Powroźnik,et al.  Analiza właściwości wybranych algorytmów heurystycznych zastosowanych w elastycznym modelu szeregowania zadań , 2011 .

[5]  Giuseppe Lipari,et al.  Elastic Scheduling for Flexible Workload Management , 2002, IEEE Trans. Computers.