Supplier Quality Management Inside and Outside the Construction Industry

Abstract: Supplier quality management (SQM) inside the construction industry is complex given the one-off nature of projects and the enormity of project size and life cycle. The resultant supply chain that supports these projects is extremely broad and deep, creating unique challenges with managing a network of hundreds and even thousands of independent contractors, sub-contractors, and suppliers that often span the globe. It is a continual challenge to ensure that the project equipment, products, and materials that are produced are not in need of rework. This article summarizes findings from the literature of diverse approaches for SQM in the construction industry, and from other industries such as healthcare, manufacturing, aerospace, and food and restaurant. The aim is to identify approaches that could be beneficial to the construction industry such as supplier partnerships, category captain management, and product life cycle management and to determine how these approaches might be adapted to the construction industry. Engineering managers are challenged to improve SQM within an environment of limited resources. By investigating effective practices of SQM inside and outside the construction industry, the engineering manager can leverage and apply these practices. The contribution of this article includes examining and identifying diverse practices for assuring supplier quality. These practices can be applied by engineering practitioners to improve the current management systems so that poor quality problems can be prevented.

[1]  Thais da C. L. Alves,et al.  Supplier Quality Surveillance Practices in Construction , 2013 .

[2]  Jeffrey K. Liker,et al.  Toyota Culture: The Heart and Soul of the Toyota Way , 2008 .

[3]  James E. Austin,et al.  Starbucks and Conservation International , 2004 .

[4]  Richard J. Linn,et al.  Supplier Selection Based on Process Capability and Price Analysis , 2006 .

[5]  Eric W. Ford,et al.  Mitigating risks, visible hans, inevitable disasters, and soft variables: Management research that matters to managers , 2003, IEEE Engineering Management Review.

[6]  J. Duncan,et al.  Mitigating risks, visible hans, inevitable disasters, and soft variables: Management research that matters to managers , 2003, IEEE Engineering Management Review.

[7]  Dale K. Gordon The Future of Quality Management Standards , 2006 .

[8]  Andrew Taylor,et al.  Strategic partnerships and relationship marketing in healthcare , 2005 .

[9]  J. Hershauer,et al.  TOTAL QUALITY MANAGEMENT IN THE SUPPLY CHAIN : WHAT IS ITS IMPACT ON PERFORMANCE? , 1997 .

[10]  Yoshua Neuman,et al.  A quantitative analysis of supplier quality in the engineer-procure-construct industry , 2014 .

[11]  Elizabeth A. Cudney,et al.  Methods and considerations for the development of emerging manufacturing technologies into a global aerospace supply chain , 2011 .

[12]  David Arditi,et al.  Impact of Resources and Strategies on Construction Company Performance , 2010 .

[13]  Thomas J. Peters,et al.  The Leadership Factor@@@Leadership and Innovation@@@Making a Leadership Change@@@Thriving on Chaos, Handbook for a Management Revolution , 1989 .

[14]  David Arditi,et al.  FACTORS THAT AFFECT PROCESS QUALITY IN THE LIFE CYCLE OF BUILDING PROJECTS , 1998 .

[15]  G. W. Chase Effective Total Quality Management (TQM) Process for Construction , 1993 .

[16]  Jeffrey K. Liker,et al.  The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .

[17]  H. Cooper Organizing knowledge syntheses: A taxonomy of literature reviews , 1988 .

[18]  David Arditi,et al.  Total quality management in the construction process , 1997 .

[19]  M. Primo,et al.  Technological Capabilities of Brazilian Shipbuilding Suppliers , 2012 .

[20]  Hung-Yi Wu,et al.  A Study on the Relationship among Supplier Capability, Partnership and Competitive Advantage in Taiwan's Semiconductor Industry , 2011, Int. J. Electron. Bus. Manag..

[21]  R. Torraco Writing Integrative Literature Reviews: Guidelines and Examples , 2005 .

[22]  Arawati Agus,et al.  The significant effect of information sharing and strategic supplier partnership on supplier performance , 2011 .

[23]  William J. O'Brien,et al.  Rapid assessment and selection of engineered equipment suppliers , 2012 .

[24]  M. Ivimey Annual report , 1958, IRE Transactions on Engineering Writing and Speech.

[25]  John Solano HVAC Cost Share Estimating Methodology, Means and Methods , 2009 .

[26]  Frederick D. Lazar,et al.  PARTNERING--NEW BENEFITS FROM PEERING INSIDE THE BLACK BOX , 1997 .

[27]  Mark Hollyoake A Model for Strategic Partnership Development: ‘Developing Supplier-Hospital Relationships – A Route Map to Success in the Early Phases’ , 2006 .

[28]  Thais da C. L. Alves,et al.  Analysis of Supplier Quality Surveillance in EPC Projects , 2014 .

[29]  Robert L. K. Tiong,et al.  A Fuzzy Decision Framework for Contractor Selection , 2005 .

[30]  Amarjit Singh,et al.  Leadership to Improve Quality Within an Organization , 2007 .

[31]  Bill Trombetta Marketing Masterclass: Category Captain Management: An Alternative to the Blockbuster Model? , 2007 .

[32]  Shamail Ahmad An analysis of process vs. inspection capabilities in fabricated, engineered-to-order supply chains , 2014 .

[33]  R. Bouncken Supply Chain Contingencies: The Effects of Up-Stream Directives on Supplier's Innovation Performance , 2011 .

[34]  Leonhard E. Bernold,et al.  Success of Supplier Alliances for Capital Projects , 2005 .

[35]  Barrie Dale,et al.  Some supplier quality assurance assessment issues , 1989 .

[36]  John J. Flaig The Quality Implications of Increasing the Number of Suppliers , 2002 .

[37]  Madjid Tavana,et al.  A supplier selection and order allocation model with multiple transportation alternatives , 2011 .

[38]  Cindy L. Menches,et al.  Materials Management Practices in the Construction Industry , 2015 .

[39]  Kenneth T. Sullivan,et al.  Quality Management Programs in the Construction Industry: Best Value Compared with Other Methodologies , 2011 .

[40]  Jongwoo Jeon Success Factors for a Lessons-Learned System in a Construction Organization , 2009 .

[41]  David K. Watkins,et al.  Quality management's role in global sourcing , 2005 .

[42]  Peter E.D. Love,et al.  Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .

[43]  Tommy Y. Lo Quality culture: a product of motivation within organization , 2002 .