Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain
暂无分享,去创建一个
[1] Simone Zanoni,et al. Single-vendor single-buyer with integrated transport-inventory system: Models and heuristics in the case of perishable goods , 2007, Comput. Ind. Eng..
[2] Kun-Jen Chung. "A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives": A comment , 2009, Eur. J. Oper. Res..
[3] Rommert Dekker,et al. An efficient optimal solution method for the joint replenishment problem with minimum order quantities , 2003, Eur. J. Oper. Res..
[4] Suresh Kumar Goyal,et al. The Individually Responsible and Rational Decision Approach to Economic Lot Sizes for One Vendor and Many Purchasers: A Comment* , 1992 .
[5] J. B. G. Frenk,et al. The joint replenishment problem with variable production costs , 2006, Eur. J. Oper. Res..
[6] Mohamed Ben-Daya,et al. Integrated inventory control and inspection policies with deterministic demand , 2006, Comput. Oper. Res..
[7] B. C. Cha,et al. The joint replenishment problem with resource restriction , 2006, Eur. J. Oper. Res..
[8] Roger M. Hill,et al. The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem , 1999 .
[9] Beatriz Abdul-Jalbar,et al. Single cycle policies for the one-warehouse N-retailer inventory/distribution system , 2006 .
[10] S. Viswanathan,et al. Coordinating supply chain inventories through common replenishment epochs , 2001, Eur. J. Oper. Res..
[11] Jason Chao-Hsien Pan,et al. A study of an integrated inventory with controllable lead time , 2002 .
[12] R. M. Hill,et al. Another look at the single-vendor single-buyer integrated production-inventory problem , 2006 .
[13] Hui-Ming Wee,et al. A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives , 2007, Eur. J. Oper. Res..
[14] Yong-Wu Zhou,et al. Optimal production and shipment models for a single-vendor-single-buyer integrated system , 2007, Eur. J. Oper. Res..
[15] M. A. Hoque,et al. An optimal solution technique for the joint replenishment problem with storage and transport capacities and budget constraints , 2006, Eur. J. Oper. Res..
[16] Prafulla Joglekar,et al. The Individually Responsible and Rational Decision Approach to Economic Lot Sizes for One Vendor and Many Purchasers , 1990 .
[17] M. Darwish,et al. Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost , 2007, Eur. J. Oper. Res..
[18] André Langevin,et al. Scheduling of multi-buyer joint replenishments , 2004 .
[19] Stephen M. Disney,et al. Production, Manufacturing and Logistics An integrated production and inventory model to dampen upstream demand variability in the supply chain , 2006 .
[20] Lu Lu. A one-vendor multi-buyer integrated inventory model , 1995 .
[21] Douglas J. Thomas,et al. Coordinated supply chain management , 1996 .
[22] Taebok Kim,et al. Joint economic procurement—production–delivery policy for multiple items in a single-manufacturer, multiple-retailer system , 2006 .
[23] Liang-Yuh Ouyang,et al. Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction , 2006, Eur. J. Oper. Res..