Multi-Crane Scheduling in Batch Annealing Process
暂无分享,去创建一个
[1] Yun Jiang,et al. An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem , 2005, Oper. Res..
[2] Ling Li,et al. Single hoist cyclic scheduling with multiple tanks: a material handling solution , 2003, Comput. Oper. Res..
[3] Gilbert Laporte,et al. A branch‐and‐cut algorithm for the quay crane scheduling problem in a container terminal , 2006 .
[4] Yun Jiang,et al. Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution , 2002 .
[5] W. C. Ng,et al. Crane scheduling in container yards with inter-crane interference , 2005, Eur. J. Oper. Res..
[6] Ebru K. Bish,et al. A multiple-crane-constrained scheduling problem in a container terminal , 2003, Eur. J. Oper. Res..
[7] Andrew N. Hrymak,et al. Scheduling of the batch annealing process — deterministic case , 1999 .
[8] Chengbin Chu,et al. Multi-degree cyclic scheduling of two robots in a no-wait flowshop , 2005, IEEE Transactions on Automation Science and Engineering.
[9] Lei Wang,et al. Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures , 2006 .
[10] Y. Zhu,et al. Crane scheduling with non-crossing constraint , 2006, J. Oper. Res. Soc..
[11] Yun Jiang,et al. Multihoist Cyclic Scheduling With Fixed Processing and Transfer Times , 2007, IEEE Transactions on Automation Science and Engineering.
[12] Lixin Tang,et al. Scheduling of a single crane in batch annealing process , 2009, Comput. Oper. Res..
[13] Lixin Tang,et al. Crane scheduling in batch annealing process , 2008, 2008 IEEE International Conference on Automation and Logistics.