A framework for an automated and integrated project monitoring and control system for steel fabrication projects

[1]  A. Alan B. Pritsker,et al.  Introduction to simulation and SLAM II , 1979 .

[2]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[3]  Luh-Maan Chang Preparing for Construction in the 21st Century , 1991 .

[4]  Osama Abudayyeh,et al.  Integrated cost and schedule control automation , 1991 .

[5]  James E. Diekmann,et al.  Knowledge-based approach to construction project control , 1992 .

[6]  Garold D. Oberlender Project Management for Engineering and Construction , 1993 .

[7]  Diego Echeverry,et al.  Bar-code Control of Construction Field Personnel and Construction Materials , 1997 .

[8]  Judith S. Dahmann,et al.  Creating Computer Simulation Systems: An Introduction to the High Level Architecture , 1999 .

[9]  Stephen John Turner,et al.  Distributed supply chain simulation across enterprise boundaries , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[10]  Paul M. Goodrum,et al.  U.S. construction labor productivity trends, 1970-1998 , 2000 .

[11]  Peter E.D. Love,et al.  An application of the Internet-based project management system , 2001 .

[12]  Min-Yuan Cheng,et al.  Integrating barcode and GIS for monitoring construction progress , 2002 .

[13]  Rafael Sacks,et al.  Building Project Model Support for Automated Labor Monitoring , 2003 .

[14]  Richard M. Fujimoto Distributed simulation systems , 2003, Proceedings of the 2003 Winter Simulation Conference, 2003..

[15]  Ronie Navon,et al.  Can Labor Inputs be Measured and Controlled Automatically , 2003 .

[16]  Osama Moselhi,et al.  Web‐based integrated project control system , 2004 .

[17]  Geraldine S. Cheok,et al.  Performance evaluation facility for ladars , 2004, SPIE Defense + Commercial Sensing.

[18]  Ji Li Web-based integrated project control , 2004 .

[19]  Osama Moselhi,et al.  A reasoning process in support of integrated project control , 2005 .

[20]  Aviad Shapira,et al.  Feasibility of automated monitoring of lifting equipment in support of project control , 2005 .

[21]  Ronie Navon,et al.  Automated project performance control of construction projects , 2005 .

[22]  SangHyun Lee and Feniosky Peña-Mora Visualization Of Construction Progress Monitoring , 2006 .

[23]  Yassir AbdelRazig,et al.  A Framework for Real-Time Construction Project Progress Tracking , 2006 .

[24]  Rafael Sacks,et al.  Assessing research issues in Automated Project Performance Control (APPC) , 2007 .

[25]  Richard M. Fujimoto,et al.  Offloading Data Distribution Management to Network Processors in HLA-Based Distributed Simulations , 2008, IEEE Transactions on Parallel and Distributed Systems.

[26]  Sangyoon Chin,et al.  RFID+4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings , 2008 .

[27]  Po-Han Chen Integration of cost and schedule using extensive matrix method and spreadsheets , 2008 .

[28]  Sangchul KimS. Kim,et al.  Integrated cost and schedule control in the Korean construction industry based on a modified work-packaging model , 2008 .

[29]  Simaan M. AbouRizk,et al.  An overview of the COSYE environment for construction simulation , 2009, Proceedings of the 2009 Winter Simulation Conference (WSC).