Los Alamos plutonium facility applied systems integration project status report for period ending August 31, 1981
暂无分享,去创建一个
The conceptual design of an on-line, near-real-time nondestructive assay instrumentation network for the Los Alamos Plutonium Facility is complete. Analysis of instrument history data indicates that the instrument certification procedures need improvement. Analysis of exhaust filter data has led to the derivation of a buildup prediction equation that is a function of throughput. This suggests that development of a generalized model is possible. A number of routine reports are now available from the Plutonium Facility/Los Alamos Safeguards System including inventories and active reports.