Minimizing total costs in flow shops with overlapping operations: the importance of gap costs
暂无分享,去创建一个
[1] Farzad Mahmoodi,et al. Lot Splitting in Unbalanced Production Systems , 1998 .
[2] Nico Vandaele,et al. Clips: a capacity and lead time integrated procedure for scheduling , 1998 .
[3] A. Buss,et al. Lot Splitting in Stochastic Flow Shop and Job Shop Environments , 1996 .
[4] Ferda Can Çetinkaya,et al. Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated , 1994 .
[5] Kenneth R. Baker,et al. Basic Techniques for Lot Streaming , 1993, Oper. Res..
[6] Dean H. Kropp,et al. Optimal and Heuristic Models for Lot Splitting in a Flow Shop , 1990 .
[7] F. Robert Jacobs,et al. REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .
[8] Uday S. Karmarkar,et al. Lot Sizes, Lead Times and In-Process Inventories , 1987 .
[9] Stephen C. Graves,et al. Overlapping operations in material requirements planning , 1986 .