Treatment of Hydro Capability Duration Curves in Probability Calculations

[1]  A. Pat Jones,et al.  Use of Probability Methods in the Economic Justifcation of Interconnecting Facilities Between Power Systems in South Texas , 1958, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[2]  Carl Kist,et al.  Probability calculations for system generation reserves , 1956, Electrical Engineering.

[3]  C. W. Watchorn,et al.  Probability Methods Applied to Generating Capacity Problems of a Combined Hydro and Steam System , 1947, Transactions of the American Institute of Electrical Engineers.

[4]  C. W. Watchorn A Simplified Basis for Applying Probability Methods to the Determination of Installed Generating Capacity Requirements , 1957, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[5]  Giuseppe Calabrese,et al.  Generating Reserve Capacity Determined by the Probability Method , 1947, Transactions of the American Institute of Electrical Engineers.

[6]  W. J. Lyman Calculating Probability of Generating Capacity Outages , 1947, Transactions of the American Institute of Electrical Engineers.

[7]  Howard P. Seelye Outage Expectancy as a Basis for Generator Reserve , 1947, Transactions of the American Institute of Electrical Engineers.