Probabilistic LMP Forecasting Considering Load Uncertainty

In power market studies, the forecast of locational marginal price (LMP) relies on the load forecasting results from the viewpoint of planning. It is well known that short-term load forecasting results always carry certain degree of errors mainly due to the random nature of the load. At the same time, LMP step changes occur at critical load levels (CLLs). Therefore, it is interesting to investigate the impact of load forecasting uncertainty on LMP. With the assumption of a certain probability distribution of the actual load, this paper proposes the concept of probabilistic LMP and formulates the probability mass function of this random variable. The expected value of probabilistic LMP is then derived, as well as the lower and upper bound of its sensitivity. In addition, two useful curves, alignment probability of deterministic LMP versus forecasted load and expected value of probabilistic LMP versus forecasted load, are presented. The first curve is designed to identify the probability that the forecasted price in a deterministic LMP matches the actual price at the forecasted load level. The second curve is demonstrated to be smooth and therefore eliminates the step changes in deterministic LMP forecasting. This helps planners avoid the possible sharp changes during decision-making process. The proposed concept and method are illustrated with a modified PJM five-bus system and the IEEE 118-bus system.

[1]  Milton Abramowitz,et al.  Handbook of Mathematical Functions with Formulas, Graphs, and Mathematical Tables , 1964 .

[2]  G. Gross,et al.  Short-term load forecasting , 1987, Proceedings of the IEEE.

[3]  G. Karady,et al.  Economic impact analysis of load forecasting , 1997 .

[4]  Jinxiang Zhu,et al.  Forecasting energy prices in a competitive market , 1999 .

[5]  J. Stonham,et al.  Decomposition model and interior point methods for optimal spot pricing of electricity in deregulation environments , 2000 .

[6]  Mainak Mazumdar,et al.  Influence of temperature and load forecast uncertainty on estimates of power generation production costs , 2000 .

[7]  Y. H. Song,et al.  Integrated bidding strategies by optimal response to probabilistic locational marginal prices , 2002 .

[8]  Yosuke Nakanishi,et al.  Study of impacts of physical contracts and financial contracts on bidding strategies of GENCOs , 2004 .

[9]  A. Conejo,et al.  Locational marginal price sensitivities , 2005, IEEE Transactions on Power Systems.

[10]  D. Kirschen,et al.  Economic impact assessment of load forecast errors considering the cost of interruptions , 2006, 2006 IEEE Power Engineering Society General Meeting.

[11]  Jian Yang Resource adequacy: economic and engineering challenges and proposed solutions , 2006 .

[12]  Fangxing Li,et al.  Continuous Locational Marginal Pricing (CLMP) , 2007, IEEE Transactions on Power Systems.

[13]  J. Price Market-Based Price Differentials in Zonal and LMP Market Designs , 2007, IEEE Transactions on Power Systems.

[14]  T. Senjyu,et al.  A Novel Approach to Forecast Electricity Price for PJM Using Neural Network and Similar Days Method , 2007, IEEE Transactions on Power Systems.

[15]  R.J. Thomas,et al.  On Computational Issues of Market-Based Optimal Power Flow , 2007, IEEE Transactions on Power Systems.

[16]  Chen-Ching Liu,et al.  Day-Ahead Electricity Price Forecasting in a Grid Environment , 2007, IEEE Transactions on Power Systems.

[17]  R. Billinton,et al.  Effects of Load Forecast Uncertainty on Bulk Electric System Reliability Evaluation , 2008, IEEE Transactions on Power Systems.

[18]  Fangxing Li,et al.  DCOPF-Based LMP simulation: algorithm, comparison with ACOPF, and sensitivity , 2007, 2008 IEEE/PES Transmission and Distribution Conference and Exposition.

[19]  Fangxing Li,et al.  Congestion and Price Prediction Under Load Variation , 2009, IEEE Transactions on Power Systems.