Reliable Maintenance Scheduling of Pumps in Existing Thermal Power Stations
暂无分享,去创建一个
[1] J. J. Nelson,et al. Reliability models for mechanical equipment , 1989, Proceedings., Annual Reliability and Maintainability Symposium.
[2] R. L. Patterson,et al. k-out-of-n:G systems: some cost considerations , 1991 .
[3] Thomas Risse. On the Evaluation of the Reliability of k-out-of-n Systems , 1987, IEEE Transactions on Reliability.
[4] Toshio Nakagawa. Mean Time to Failure with Preventive Maintenance , 1980, IEEE Transactions on Reliability.
[5] K. Shen,et al. The effectiveness of adding standby redundancy at system and component levels , 1991 .
[6] V. Jayabalan,et al. Cost optimization of maintenance scheduling for a system with assured reliability , 1992 .
[7] N. Nanayakkara,et al. Reliability analysis of submarine power cables and determination of external mechanical protections , 1991, Proceedings of the 1991 IEEE Power Engineering Society Transmission and Distribution Conference.
[8] Mazhar Ali Khan Malik,et al. Reliable Preventive Maintenance Scheduling , 1979 .