Integrating order acceptance decisions with flexible due dates in a production planning model with load-dependent lead times

We consider a tactical planning problem, which integrates production planning decisions together with order acceptance decisions, while taking into account the dependency between workload and lead times. The proposed model determines which orders to accept and in which period they should be produced, so that they can be delivered to the customer within the acceptable flexible due dates. When the number of accepted orders increases, the workload and production lead time also increase, and this may result in the possibility of missing customer due dates. This problem is formulated as a mixed integer linear programme for which two relax-and-fix heuristic solution methods are proposed. The first one decomposes the problem based on time periods, while the second decomposes it based on orders. The performances of these heuristics are compared with that of a state-of-the-art commercial solver. Our results show that the time-based relax-and-fix heuristic outperforms the order-based relax-and-fix heuristic, and the solver solution as it yields better integrality gaps for much less CPU effort.

[1]  Hamdy A. Taha,et al.  Operations research: an introduction / Hamdy A. Taha , 1982 .

[2]  V. Cristina Ivanescu,et al.  Makespan estimation and order acceptance in batch process industries when processing times are uncertain , 2002, OR Spectr..

[3]  R. Uzsoy,et al.  Tractable nonlinear production planning models for semiconductor wafer fabrication facilities , 2006, IEEE Transactions on Semiconductor Manufacturing.

[4]  Reinaldo Morabito,et al.  Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants , 2010, Comput. Oper. Res..

[5]  Reinaldo Morabito,et al.  Lot sizing and sequencing optimisation at an animal-feed plant , 2009, Comput. Ind. Eng..

[6]  Hartmut Stadtler,et al.  Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows , 2003, Oper. Res..

[7]  David L. Woodruff,et al.  Production planning with load dependent lead times: an update of research , 2007, Ann. Oper. Res..

[8]  Hubert Missbauer Order release planning with clearing functions: A queueing-theoretical analysis of the clearing function concept , 2011 .

[9]  Karl G. Kempf,et al.  Decision Policies for Production Networks , 2012 .

[10]  Awi Federgruen,et al.  Time‐partitioning heuristics: Application to one warehouse, multiitem, multiretailer lot‐sizing problems , 1999 .

[11]  Susan A. Slotnick,et al.  Order acceptance and scheduling: A taxonomy and review , 2011, Eur. J. Oper. Res..

[12]  Reha Uzsoy,et al.  Production planning with resources subject to congestion , 2009 .

[13]  Laurence A. Wolsey,et al.  Production Planning by Mixed Integer Programming , 2010 .

[14]  Reha Uzsoy,et al.  An integrated production planning model with load-dependent lead-times and safety stocks , 2009, Comput. Chem. Eng..

[15]  J. Geunes,et al.  Uncapacitated production and location planning models with demand fulfillment flexibility , 2006 .

[16]  Paul M. Griffin,et al.  Order selection and scheduling with leadtime flexibility , 2004 .

[17]  Tarik Aouam,et al.  Integrated production planning and order acceptance under uncertainty: A robust optimization approach , 2013, Eur. J. Oper. Res..

[18]  N. Brahimi A Relax-and-Fix Heuristic for a Production Planning Problem with Order Acceptance and Flexible Due Dates , 2013 .

[19]  Hubert Missbauer,et al.  Aggregate order release planning for time-varying demand , 2002 .

[20]  Stephen C. Graves,et al.  A Tactical Planning Model for a Job Shop , 1986, Oper. Res..

[21]  David D. Yao,et al.  A Supply Network Model with Base-Stock Control and Service Requirements , 2000, Oper. Res..

[22]  Patrizia Beraldi,et al.  Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs , 2008, Comput. Oper. Res..

[23]  Heinrich Kuhn,et al.  MARKOV DECISION MODELS FOR ORDER ACCEPTANCE / REJECTION PROBLEMS , 2005 .

[24]  Reha Uzsoy,et al.  Using System Dynamics Simulations to Compare Capacity Models for Production Planning , 2006, Proceedings of the 2006 Winter Simulation Conference.

[25]  David L. Woodruff,et al.  Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .

[26]  A. Srinivasan,et al.  Resource Pricing And Aggregate Scheduling In Manufacturing Systems , 1988 .

[27]  Kerem Akartunali,et al.  A heuristic approach for big bucket multi-level production planning problems , 2009, Eur. J. Oper. Res..

[28]  GhianiGianpaolo,et al.  Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs , 2008 .

[29]  Steven T. Hackman,et al.  Production Economics: Integrating the Microeconomic and Engineering Perspectives , 2007 .

[30]  R. Uzsoy,et al.  Chance-Constraint-Based Heuristics for Production Planning in the Face of Stochastic Demand and Workload-Dependent Lead Times , 2012 .

[31]  Reha Uzsoy,et al.  Zero-order production planning models with stochastic demand and workload-dependent lead times , 2015 .

[32]  Albert P. M. Wagelmans,et al.  A Dynamic Lot-Sizing Model with Demand Time Windows , 1999, Manag. Sci..

[33]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[34]  Reha Uzsoy,et al.  Using a mathematical programming model to examine the marginal price of capacitated resources , 2011 .

[35]  Awi Federgruen,et al.  Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems , 2007, Oper. Res..

[36]  Joseph Geunes,et al.  Requirements Planning with Pricing and Order Selection Flexibility , 2006, Oper. Res..

[37]  Joseph Geunes,et al.  Models for Integrated Production Planning and Order Selection , 2002 .

[38]  Hamdy A. Taha,et al.  Operations Research: An Introduction, 8/e , 2008 .

[39]  Egon Balas,et al.  Integer Programming , 2021, Encyclopedia of Optimization.

[40]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[41]  Mohammad Mohammadi,et al.  Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups , 2010, J. Intell. Manuf..

[42]  David L. Woodruff,et al.  Production planning with load dependent lead times , 2005, 4OR.