The degradation-rate-reduction preventive maintenance policies with warranty in a finite time span

A system normally has a finite useful life. The new system in each replacement cycle seldom has exactly the same characteristics and properties. However, maintenance problems are usually defined over the infinite time span where the system is assumed to have the same conditions and costs in each replacement cycle. This assumption might not be practical. Therefore, the purpose of this research is to develop the optimal preventive maintenance (PM) policies with degradation rate reduction over a finite time span under a warranty consideration by minimizing the expected total maintenance cost. Two cases are studied and compared, one is no warranty provided and the other is with a given warranty period. For the second case, two policies, performing and not performing PM within the warranty period, are examined. In this paper, the algorithm for searching the optimal solution is presented. Examples are given and the sensitivity analysis is also provided.

[1]  D. N. P. Murthy,et al.  Maintenance strategies for used equipment under lease , 2006 .

[2]  J.-K. Chan,et al.  Modeling repairable systems with failure rates that depend on age and maintenance , 1993 .

[3]  Chun-Yuan Cheng,et al.  The finite-time-period preventive maintenance policies with failure rate reduction under a warranty consideration , 2010 .

[4]  D. N. Prabhakar Murthy,et al.  Optimal preventive maintenance of leased equipment with corrective minimal repairs , 2006, Eur. J. Oper. Res..

[5]  D. N. Prabhakar Murthy,et al.  Optimal decision making in a maintenance service operation , 1999, Eur. J. Oper. Res..

[6]  Toshio Nakagawa,et al.  Imperfect Preventive-Maintenance , 1979, IEEE Transactions on Reliability.

[7]  Cheng-Kang Chen,et al.  Periodical Preventive-Maintenance Contract for a Leased Facility with Weibull Life-Time , 2006 .

[8]  Young Ho Chun,et al.  An Algorithm for Preventive Maintenance Policy , 1986, IEEE Transactions on Reliability.

[9]  Dong Ho Park,et al.  Cost minimization for periodic maintenance policy of a system subject to slow degradation , 2000, Reliab. Eng. Syst. Saf..

[10]  D. N. Prabhakar Murthy,et al.  Optimal periodic preventive maintenance policy for leased equipment , 2006, Reliab. Eng. Syst. Saf..

[11]  V. Jayabalan,et al.  Optimal maintenance—replacement policy under imperfect maintenance , 1992 .

[12]  George Lindfield,et al.  Numerical Methods Using MATLAB , 1998 .

[13]  R. V. Canfield,et al.  Cost Optimization of Periodic Preventive Maintenance , 1986, IEEE Transactions on Reliability.

[14]  Toshio Nakagawa,et al.  Optimum Policies When Preventive Maintenance is Imperfect , 1979, IEEE Transactions on Reliability.

[15]  Chun-Yuan Cheng,et al.  The Periodic Maintenance Policy for a Weibull Life-Time System with Degradation Rate Reduction under Reliability Limit , 2008, Asia Pac. J. Oper. Res..

[16]  David R. Kincaid,et al.  Numerical mathematics and computing , 1980 .

[17]  Mingchih Chen,et al.  THE OPTIMAL PERIODIC PREVENTIVE MAINTENANCE POLICY WITH RELIABILITY LIMIT FOR THE CASE OF DEGRADATION RATE REDUCTION , 2006 .

[18]  Ruey Huei Yeh,et al.  Optimal periodic replacement policy for repairable products under free-repair warranty , 2007, Eur. J. Oper. Res..

[19]  Ruey Huei Yeh,et al.  Optimal threshold value of failure-rate for leased products with preventive maintenance actions , 2007, Math. Comput. Model..

[20]  T. Nakagawa Periodic and sequential preventive maintenance policies , 1986 .