Managing Complex Engineering Interfaces of Urban Mass Rapid Transit Projects
暂无分享,去创建一个
[1] David H.K. Chua,et al. Use of a WBS Matrix to Improve Interface Management in Projects , 2006 .
[2] Linn C. Stuckenbruck. Integration: The Essential Function of Project Management , 2008 .
[3] Yvan J. Beliveau,et al. INTERFACE MANAGEMENT—A FACILITATOR OF LEAN CONSTRUCTION AND AGILE PROJECT MANAGEMENT , 2007 .
[4] 邱金鶴,et al. 解決捷運工程施工界面問題之探討-以臺北捷運(CD550標)工程為例; The study of how to solving the construction interface problems on Mass Rapid Transportation engineering-Taipei Metro (CD550) project as example. , 2008 .
[5] Karen Ayas,et al. Integrating corporate learning with project management , 1997 .
[6] Michael Chou,et al. In-house Combined Services Drawing / Structural, Electrical & Mechanical (CSD/SEM) Coordination and Drawing Production for Downtown Line 1 (DTL1) Promenade Station and Tunnels , 2010 .
[7] Abdul-Mohsen Al-Hammad. Common Interface Problems among Various Construction Parties , 2000 .
[8] Uri Nooteboom. Interface Management Improves On-Time, On-Budget Delivery of Megaprojects , 2004 .
[9] Peter W. G. Morris. Managing Project Interfaces—Key Points for Project Success , 2008 .
[10] Keith R. Molenaar,et al. PUBLIC-SECTOR DESIGN/BUILD EVOLUTION AND PERFORMANCE , 1999 .
[11] William Ibbs,et al. Design and construction coordination problems and planning for design–build project new users , 2010 .
[12] Yu-Cheng Lin. Construction network-based interface management system , 2013 .
[13] Alistair G.F. Gibb,et al. Interface Management within Construction: In Particular, Building Facade , 2003 .
[14] Ari-Pekka Hameri,et al. What to be implemented at the early stage of a large-scale project , 1997 .