Creating annual delivery programs of liquefied natural gas

The annual delivery program (ADP) setup is an important problem in liquefied natural gas (LNG) supply chain planning. The ADP for an actor in the chain is the complete sailing schedule of the ships in the fleet for the coming year. In this paper we focus on the ADP planning problem for one of the world’s largest producers of LNG. The producer is responsible for the LNG inventories at the liquefaction plant, the loading port with a limited number of berths, and the routing and scheduling of a heterogeneous fleet of LNG ships. In addition, the producer has to fulfill a set of long-term contracts to customers all around the world. The objective is to design an ADP to fulfill the long-term contracts at minimum cost, while maximizing revenue from selling LNG in the spot market. A mixed integer programming (MIP) formulation of the ADP planning problem is presented and solved with a branch-and-cut algorithm. Several types of valid inequalities are developed that allow us to reduce the linear programming gap of the MIP formulation. The computational study shows that the problem is very complex, but that the valid inequalities are effective.

[1]  Kjetil Fagerholt,et al.  Ship routing and scheduling in the new millennium , 2013, Eur. J. Oper. Res..

[2]  Vikas Goel,et al.  A hybrid heuristic strategy for liquefied natural gas inventory routing , 2015 .

[3]  Frode Rømo,et al.  LNGScheduler: a rich model for coordinating vessel routing, inventories and trade in the liquefied natural gas supply chain , 2010 .

[4]  Kjetil Fagerholt,et al.  Transportation Planning and Inventory Management in the LNG Supply Chain , 2010 .

[5]  Kjetil Fagerholt,et al.  A construction and improvement heuristic for a liquefied natural gas inventory routing problem , 2012, Comput. Ind. Eng..

[6]  Martin W. P. Savelsbergh,et al.  A Branch-Price-and-Cut Algorithm for Single-Product Maritime Inventory Routing , 2012, Oper. Res..

[7]  Marielle Christiansen,et al.  Branch-Price-and-Cut for Creating an Annual Delivery Program of Multi-Product Liquefied Natural Gas , 2012 .

[8]  Inge Norstad,et al.  A rolling horizon heuristic for creating a liquefied natural gas annual delivery program , 2011 .

[9]  Kjetil Fagerholt,et al.  Routing and scheduling in a liquefied natural gas shipping problem with inventory and berth constraints , 2010, Annals of Operations Research.

[10]  Marielle Christiansen,et al.  A new decomposition algorithm for a liquefied natural gas inventory routing problem , 2016 .

[11]  Marielle Christiansen,et al.  Supply Chain Optimization for the Liquefied Natural Gas Business , 2009 .

[12]  Vikas Goel,et al.  Large neighborhood search for LNG inventory routing , 2012, J. Heuristics.

[13]  Marte Fodstad,et al.  Using and extending fix-and-relax to solve maritime inventory routing problems , 2013 .

[14]  Kevin C. Furman,et al.  A maritime inventory routing problem: Practical approach , 2013, Comput. Oper. Res..

[15]  Vikas Goel,et al.  Constraint programming for LNG ship scheduling and inventory management , 2015, Eur. J. Oper. Res..

[16]  Kevin C. Furman,et al.  Feedstock Routing in the ExxonMobil Downstream Sector , 2011, Interfaces.

[17]  Marielle Christiansen,et al.  A Branch-and-Price Method for a Liquefied Natural Gas Inventory Routing Problem , 2010, Transp. Sci..