Heuristic Algorithm of Scheduling Model for Cold Coils Annealing
暂无分享,去创建一个
Tao Wu | Rongqiu Chen | Rongqiu Chen | Tao Wu
[1] Andrew N. Hrymak,et al. Scheduling of the batch annealing process — deterministic case , 1999 .
[2] Stephen F. Smith,et al. ISIS—a knowledge‐based system for factory scheduling , 1984 .
[3] Mark S. Fox,et al. Contingencies for the design of scheduling expert systems , 1993 .
[4] Norman Sadeh,et al. MICRO-BOSS: A micro-opportunistic factory scheduler , 1993 .
[5] Albert Lee,et al. Evaluation of ordering strategies for constraint satisfaction reactive scheduling , 1998, Decis. Support Syst..
[6] G. Reklaitis,et al. Scheduling network flowshops so as to minimize makespan , 1989 .
[7] S. E. Elmaghraby,et al. Production control in hybrid flowshops: an example from textile manufacturing , 1997 .
[8] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[9] Krzysztof Giaro. NP-hardness of compact scheduling in simplified open and flow shops , 2001, Eur. J. Oper. Res..
[10] Jatinder N. D. Gupta,et al. Two-stage no-wait scheduling models with setup and removal times separated , 1997, Comput. Oper. Res..
[11] Chelliah Sriskandarajah,et al. Some no-wait shops scheduling problems: Complexity aspect , 1986 .
[12] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .