수인선의 전동열차 운영방법에 관한 연구
暂无分享,去创建一个
Suin line is expected to be opened completely in 2015 by three stages. And the line between Suwon and Incheon(54.0㎞) is under construction to supply the users of southwestern area transportation convenience. The route of Suin line will be constructed to share partly with Ansan line and connect directly with Bundang line to the east and Kyeongin line to the west. That's why a lot of difficulty in train and rolling stock operation is expected. This paper proposes an alternative plan of train operation when the line is opened partly and completely and makes an optimally alternative plan through the analyses of transportation demand, the change of human resources of operation sector according to train operation plan by an alternative proposal and operation cost.