MILP-based Approach for the Scheduling of Automated Manufacturing System with Sequence-Dependent transferring times
暂无分享,去创建一个
[1] Iftekhar A. Karimi,et al. An MILP Approach to Automated Wet-Etch Station Scheduling , 2003 .
[2] P. Castro,et al. Integrated Constraint Programming Scheduling Approach for Automated Wet-Etch Stations in Semiconductor Manufacturing , 2011 .
[3] Yves Crama,et al. Combinatorial optimization models for production scheduling in automated manufacturing systems , 1997 .
[4] Henry L. W. Nuttle,et al. Hoist Scheduling For A PCB Electroplating Facility , 1988 .
[5] L. W. Phillips,et al. Mathematical Programming Solution of a Hoist Scheduling Program , 1976 .
[6] Jaime Cerdá,et al. An MILP Continuous-Time Framework for Short-Term Scheduling of Multipurpose Batch Processes Under Different Operation Strategies , 2003 .
[7] Pedro M. Castro,et al. A novel optimization method to automated wet-etch station scheduling in semiconductor manufacturing systems , 2011, Comput. Chem. Eng..