A simulation model for multi-project resource allocation
暂无分享,去创建一个
Abstract There are limited solution techniques available for resource constrained single project scheduling with stochastic task durations. Due to computational complexity, optimal solution or heuristics for scheduling have been found useful for large deterministic problems. This complexity is more and more for common resource constraint with multi-projects (parallel projects). The main objective of this problem is scheduling the projects as soon as possible with better utilization of common available resource constraint. This paper considers the problem of multi-project resource allocation (MPRA) as a multi-channel queuing system. Simulation modelling has been used to solve the MPRA problem. This paper demonstartes a framework and a procedure with use of a general purpose simulation language like GPSS's blocks to generate a simulation model. Then to show how to model works, a numerical example is given and statistical results are recorded. The model has the capability to obtain the completion time distribution function for each project, throughput time (makespan) and consumed resource distribution.
[1] Robert J Willis,et al. An iterative scheduling technique for resource-constrained project scheduling , 1992 .
[2] Osman Oguz,et al. A comparative study of computational procedures for the resource constrained project scheduling problem , 1994 .
[3] Erik Demeulemeester,et al. An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem , 1996 .
[4] Richard F. Deckro,et al. A decomposition approach to multi-project scheduling , 1991 .