A simple and better algorithm to solve the vendor managed inventory control system of multi-product multi-constraint economic order quantity model

This research presents an alternative heuristic algorithm to solve the vendor management inventory system with multi-product and multi-constraint based on EOQ with backorders considering two classical backorders costs: linear and fixed. For this type of inventory system, the optimization problem is a nonlinear integer programming (NLIP). Several numerical examples are given to demonstrate that the proposed heuristic algorithm is better than the previous genetic algorithm published based on three aspects: the total cost, the number of evaluations of the total cost function and computational time. Furthermore, the proposed algorithm is simpler and can be implemented by any people.

[1]  Ming-Feng Yang Applying the linear particle swarm optimization to a serial multi-echelon inventory model , 2010, Expert Syst. Appl..

[2]  Seyed Taghi Akhavan Niaki,et al.  A genetic algorithm for vendor managed inventory control system of multi-product multi-constraint economic order quantity model , 2011, Expert Syst. Appl..

[3]  Leopoldo Eduardo Cárdenas-Barrón,et al.  The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra , 2011 .

[4]  Leopoldo Eduardo Cárdenas-Barrón Adaptive genetic algorithm for lot-sizing problem with self-adjustment operation rate: A discussion , 2010 .

[5]  Mostafa Zandieh,et al.  Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage , 2011, Expert Syst. Appl..

[6]  Tai-Hsi Wu,et al.  A simulated annealing algorithm for manufacturing cell formation problems , 2008, Expert Syst. Appl..

[7]  Mehmet Mutlu Yenisey,et al.  A multi-objective ant colony system algorithm for flow shop scheduling problem , 2010, Expert Syst. Appl..

[8]  Ford W. Harris,et al.  How Many Parts to Make at Once , 1990, Oper. Res..

[9]  Chang Ouk Kim,et al.  Situation reactive approach to Vendor Managed Inventory problem , 2009, Expert Syst. Appl..

[10]  Mohammad Bagher Fakhrzad,et al.  Combination of genetic algorithm with Lagrange multipliers for lot-size determination in multi-stage production scheduling problems , 2009, Expert Syst. Appl..

[11]  Ahmet Bedri Özer,et al.  CIDE: Chaotically Initialized Differential Evolution , 2010, Expert Syst. Appl..

[12]  Manoj Kumar Tiwari,et al.  Hybrid tabu-simulated annealing based approach to solve multi-constraint product mix decision problem , 2005, Expert Syst. Appl..

[13]  Manoj Kumar Tiwari,et al.  An integrated approach for logistic and vendor managed inventory in supply chain , 2010, Expert Syst. Appl..

[14]  Ping-Feng Pai,et al.  A simulation of vendor managed inventory dynamics using fuzzy arithmetic operations with genetic algorithms , 2010, Expert Syst. Appl..

[15]  Ali Husseinzadeh Kashan,et al.  A differential evolution algorithm for the manufacturing cell formation problem using group based operators , 2010, Expert Syst. Appl..