Grado de uso y resultados de la producción ajustada en las empresas de pavimentos y revestimientos cerámicos

This article presents research carried out in the Spanish ceramic tile industry. The aim focuses on deter- mining the degree of use of some of the most representative lean manufacturing practices and their effect on opera- tional performance of these companies. Results are presented from 76 plants (79.17% of the population) dedicated to single firing ceramics: porous tiles, stoneware floor tiles and porcelain stoneware. The most outstanding conclu- sion was that, contrary to what was expected, lean manufacturing is hardly used at all by these plants. However, the plants achieve high rates of quality and productivity. This work falls into line with others that indicate that lean manu- facturing is not a universal system, valid in any circumstances and place. Therefore, before getting rid of mass pro- duction systems in favour of more innovative ones (from the point of view of their productive efficiency), a more de- tailed analysis is required, at least, of the characteristics of each industry.

[1]  James F. Cox,et al.  An examination of just-in-time management for the small manufacturer: with an illustration , 1986 .

[2]  R. Anthony Inman,et al.  The Transferability of Just-in-Time Concepts to American Small Businesses , 1990 .

[3]  Michael E. Porter La ventaja competitiva de las naciones , 1991 .

[4]  Daniel T. Jones,et al.  The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .

[5]  A. Adcroft,et al.  Against lean production , 1992 .

[6]  J. Porta,et al.  Análisis estratégico de los sectores industriales y del turismo en la Comunidad Valenciana , 1993 .

[7]  R. Anthony Inman,et al.  Small Business and JIT: A Managerial Overview , 1993 .

[8]  Daniel T. Jones,et al.  La máquina que cambió el mundo , 1993 .

[9]  A. Sohal,et al.  Lean Production: Experience among Australian Organizations , 1994 .

[10]  Richard Florida,et al.  THE TRANSFER OF JAPANESE MANAGEMENT STYLES IN TWO US TRANSPLANT INDUSTRIES: AUTOS AND ELECTRONICS , 1995 .

[11]  John Paul Macduffie Human Resource Bundles and Manufacturing Performance: Organizational Logic and Flexible Production Systems in the World Auto Industry , 1995 .

[12]  Surendra M. Gupta,et al.  Implementation of just-in-time methodology in a small company , 1995 .

[13]  Roger G. Schroeder,et al.  Relationship Between JIT and TQM: Practices and Performance , 1995 .

[14]  Eric Molleman,et al.  Characteristics of work organization in lean production and sociotechnical systems , 1996 .

[15]  Tomas Engström,et al.  Production Model Discourse and Experiences from the Swedish Automotive Industry , 1996 .

[16]  Hiroshi Katayama,et al.  Lean production in a changing competitive world: a Japanese perspective , 1996 .

[17]  Pär Åhlström,et al.  Assessing changes towards lean production , 1996 .

[18]  Cipriano Forza,et al.  Work organization in lean production and traditional plants , 1996 .

[19]  J. Pérez,et al.  Una política industrial para la PYME: La experiencia de la cerámica española , 1996 .

[20]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[21]  Chris Rowley,et al.  Flexible specialisation: some comparative dimensions and evidence from the ceramic tile industry , 1996 .

[22]  Jeffrey L. Callen,et al.  Just-In-Time: A Cross-sectional Plant Analysis , 2000 .

[23]  S. M. James‐Moore,et al.  Is lean manufacture universally relevant? An investigative methodology , 1997 .

[24]  Christer Karlsson,et al.  A lean and global smaller firm , 1997 .

[25]  Tarun Gupta,et al.  An empirical study of just‐in‐time and total quality management principles implementation in manufacturing firms in the USA , 1997 .

[26]  Ben Dankbaar,et al.  Lean Production: Denial, Confirmation or Extension of Sociotechnical Systems Design? , 1997 .

[27]  Roger G. Schroeder,et al.  The impact of just-in-time manufacturing and its infrastructure on manufacturing performance , 1997 .

[28]  Carlos Andrés,et al.  LA INDUSTRIA CERAMICA DE LA COMUNIDAD VALENCIANA EN EL AMBITO NACIONAL Y EUROPEO , 1999 .

[29]  Joaquín Delgado Hipólito,et al.  Las técnicas justo a tiempo y su repercusión en los sistemas de producción , 2000 .

[30]  A. Sánchez,et al.  Lean indicators and manufacturing strategies , 2001 .

[31]  Victor R. Prybutok,et al.  The relationship between JIT practices and type of production system , 2001 .

[32]  R. Schroeder,et al.  Relationships between implementation of TQM, JIT, and TPM and manufacturing performance , 2001 .

[33]  Rosemary R. Fullerton,et al.  The production performance benefits from JIT implementation , 2001 .

[34]  José Carlos Prado Prado JIT (Justo a tiempo), TQM (Calidad total), BPR (Reingenería),...: ¿distintos enfoques para incrementar la competitividad? , 2002 .

[35]  Daniel Peña Sánchez de Rivera Análisis de datos multivariantes , 2002 .

[36]  Richard Cooney,et al.  Is “lean” a universal production system?: Batch production in the automotive industry , 2002 .

[37]  Peter T. Ward,et al.  Lean manufacturing: context, practice bundles, and performance , 2003 .