Reduction of blowdown flow of boiler slag bath

Based on the analysis of the operating status of the deslagging system in Zhujiang Power Plant, it is concluded that the large blowdown flow of the slag bath is caused by the high overflow of the cinder boxes. To solve the problem, a series of measures are put forward, which obtain satisfactory results in practice.