A simulation-based DFSS for a lean service system

This paper describes a simulation-based approach for applying a lean Design for Six Sigma (DFSS) methodology on a service system. At the Identify stage, Quality Function Deployment (QFD) and Process Mapping are developed to assign Critical-to-Quality (CTQ) measures to the baseline of the service process. At the Design stage, Taguchi's P-Diagram and Discrete Event Simulation (DES) are utilised to incorporate process control and random factors into the stochastic and dynamic service process. At the Optimise stage, Design of Experiments (DOE) and Lean Techniques are applied to optimise process parameters and to enhance the structure of the service process so that Six Sigma performance and high process effectiveness are achieved. Finally, at the Verify stage, the DES model is used to verify the final process design in terms of robustness and economical viability. A case study of a dental clinic is used to clarify the application of the proposed approach.

[1]  Mohamed A. Youssef,et al.  Achieving Six Sigma rating in a system simulation model , 2006 .

[2]  Genichii Taguchi,et al.  Introduction to quality engineering. designing quality into products a , 1986 .

[3]  Madhan Shridhar Phadke,et al.  Quality Engineering Using Robust Design , 1989 .

[4]  W. David Kelton Designing computer simulation experiments , 1988, WSC '88.

[5]  Anthony R Benedetto,et al.  Adapting manufacturing-based Six Sigma methodology to the service environment of a radiology film library. , 2003, Journal of healthcare management / American College of Healthcare Executives.

[6]  Daniel Roos,et al.  The machine that changed the world : the story of lean production , 1991 .

[7]  Kai Yang,et al.  Design for Six Sigma : A Roadmap for Product Development , 2003 .

[8]  Forrest W. Breyfogle,et al.  Implementing Six Sigma: Smarter Solutions Using Statistical Methods , 1999 .

[9]  Richard Schroeder,et al.  Six Sigma: The Breakthrough Management Strategy Revolutionizing the World's Top Corporations , 1999 .

[10]  J. Banks,et al.  Handbook of Simulation , 1998 .

[11]  Michael L. George,et al.  Lean Six Sigma : combining Six Sigma quality with lean speed , 2002 .

[12]  Susan M. Sanchez,et al.  Effective Engineering Design through Simulation , 1996 .

[13]  Ronald D. Snee,et al.  Six–Sigma: the evolution of 100 years of business improvement methodology , 2004 .

[14]  G. Geoffrey Vining,et al.  Taguchi's parameter design: a panel discussion , 1992 .

[15]  Jerry Banks,et al.  Handbook of simulation - principles, methodology, advances, applications, and practice , 1998, A Wiley-Interscience publication.

[16]  Michael L. George,et al.  Lean Six Sigma for Service : How to Use Lean Speed and Six Sigma Quality to Improve Services and Transactions , 2003 .

[17]  Mohamed Zairi,et al.  Quality function deployment , 1995 .

[18]  William Feld,et al.  Lean Manufacturing: Tools, Techniques, and How to Use Them , 2000 .

[19]  Taiichi Ohno,et al.  Toyota Production System : Beyond Large-Scale Production , 1988 .

[20]  Jeffrey S. Smith,et al.  Survey on the use of simulation for manufacturing system design and operation , 2003 .

[21]  Joseph J. Pignatiello,et al.  An experimental design strategy for designing robust systems using discrete-event simulation , 1991, Simul..

[22]  David M. Ferrin,et al.  Six Sigma and simulation, so what's the correlation? , 2002, Proceedings of the Winter Simulation Conference.

[23]  Sharad K. Maheshwari,et al.  A new approach to process parameter selection: Integration of quality , 1991 .

[24]  Andrew D.F. Price,et al.  An exploration of the synergies between Six Sigma, total quality management, lean construction and sustainable construction , 2005 .

[25]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[26]  Basem El‐Haik,et al.  Service Design for Six Sigma: A Roadmap for Excellence , 2005 .