An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length

This article develops an integrated model in considering the situations of an imperfect process with imperfect maintenance and inspection time for the joint determination of both economic production quantity (EPQ) and preventive maintenance (PM). This imperfect process has a general deterioration distribution with increasing hazard rate. Even with periodic PM, such a production system cannot be recovered as good as new. This means that the system condition depends on how long it runs. Also, the PM level can be distinct due to the maintenance cost. For convenience, it is assumed the age of system is reduced in proportional to the PM level. Further, during a production cycle, we need an inspection to see if the process is in control. This inspection might demand a considerable amount of time. In this article, we take PM level and inspection time into consideration to optimise EPQ with two types of out-of-control states. To see how the method works, we use a Weibull shock model to show the optimal solutions for the least costs.

[1]  M. A. Rahim,et al.  Economic design of x -control charts under Weibull shock models , 1988 .

[2]  Shey-Huei Sheu,et al.  Optimal lot-sizing problem with imperfect maintenance and imperfect production , 2004, Int. J. Syst. Sci..

[3]  Meir J. Rosenblatt,et al.  A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay , 1989 .

[4]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[5]  Shey-Huei Sheu,et al.  OPTIMAL PERIODIC REPLACEMENT POLICY WITH CHECKING TIME , 2005 .

[6]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .

[7]  Chih-Hsiung Wang Integrated production and product inspection policy for a deteriorating production system , 2005 .

[8]  Mohamed Ben-Daya,et al.  Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions , 1998 .

[9]  Mohamed Ben-Daya,et al.  The economic production lot-sizing problem with imperfect production processes and imperfect maintenance , 2002 .

[10]  M Ben-Daya,et al.  Integrated production and quality model under various preventive maintenance policies , 1998, J. Oper. Res. Soc..

[11]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[12]  H. Luss,et al.  Inspection Policies When Duration of Checkings is Non-Negligible , 1974 .

[13]  Kyung S. Park,et al.  A Stepwise partial enumeration algorithm for the economic lot scheduling problem , 1984 .

[14]  Mohamed Ben-Daya,et al.  A generalized economic model for joint determination of production run, inspection schedule and control chart design , 1998 .

[15]  M. Ben-Daya Integrated production maintenance and quality model for imperfect processes , 1999 .

[16]  Sheng-Tsaing Tseng,et al.  Imperfect maintenance policies for deteriorating production systems , 1998 .