Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects

AbstractThe aim of this paper is to propose a decision support tool for contractors before the bidding stage to quantify the probability of delay in construction projects in Turkey by using the relative importance index (RII) method incorporated into fuzzy logic. For this purpose, 83 delay factors were identified, categorized into 9 major groups through a detailed literature review process as well as interviews with experts from the construction industry. The relative importance of these delay factors and groups was quantified by using the relative importance index method. The ranking of the factors and groups was demonstrated according to their level of effect on delay. A delay assessment model was proposed using the fuzzy set theory by taking into account the delay factors characterized in construction projects. The assessment model was developed using a commercial software product. The proposed methodology was tested in a real case study; and the probability of the delay of the project was evaluated by...

[1]  Murat Gunduz,et al.  Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey , 2013 .

[2]  S. T. Kometa,et al.  Evaluation of Factors Influencing Construction Clients’ Decision to Build , 1997 .

[3]  Liyin Shen,et al.  Measuring the Networking Performance for Contractors in Practicing Construction Management , 2013 .

[4]  Jyh-Bin Yang,et al.  Causes of Delay in the Planning and Design Phases for Construction Projects , 2010 .

[5]  Joseph H. M. Tah,et al.  A proposal for construction project risk assessment using fuzzy logic , 2000 .

[6]  Paul. Olomolaiye,et al.  Attributes of UK construction clients influencing project consultants' performance , 1994 .

[7]  S. S. Mahapatra,et al.  Assessment of safety performance in Indian industries using fuzzy approach , 2012, Expert Syst. Appl..

[8]  Stephen O. Ogunlana,et al.  Quantifying schedule risk in construction projects using Bayesian belief networks , 2009 .

[9]  Achintya Haldar,et al.  Project Scheduling Using Fuzzy Set Concepts , 1984 .

[10]  Ronald McCaffer,et al.  FACTORS OF NON-EXCUSABLE DELAYS THAT INFLUENCE CONTRACTORS' PERFORMANCE , 1998 .

[11]  Abdulaziz M. Jarkas,et al.  Motivational Factors Impacting the Productivity of Construction Master Craftsmen in Kuwait , 2013 .

[12]  Irem Dikmen,et al.  Using fuzzy risk assessment to rate cost overrun risk in international construction projects , 2007 .

[13]  Van Uu Nguyen,et al.  Tender evaluation by fuzzy sets , 1985 .

[14]  Ibnu Abbas Majid Causes and effect of delays in Aceh construction industry , 2006 .

[15]  Hesham A. Bassioni,et al.  Causes of Delay in Building Construction Projects in Egypt , 2008 .

[16]  Serdar Ulubeyli,et al.  Causes of delays in construction projects in Turkey , 2012 .

[17]  A. S. Alnuaimi,et al.  Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman , 2010 .

[18]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[19]  Ming Sun,et al.  PCIM: a project control and inhibiting-factors management model , 2013 .

[20]  Lauri Koskela,et al.  Need for Alternative Research Approaches in Construction Management: Case of Delay Studies , 2013 .

[21]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[22]  K. Ahn,et al.  Assessment of the potential applicability of fuzzy set theory to accident progression event trees with phenomenological uncertainties , 1992 .

[23]  Albert P.C. Chan,et al.  Fuzzy set theory approach for measuring the performance of relationship-based construction projects in Australia , 2012 .

[24]  Roozbeh Kangari,et al.  Construction risk assessment by linguistics , 1989 .

[25]  Jong H. Ock,et al.  Pricing construction risk: fuzzy set application , 1993 .

[26]  Amund Bruland,et al.  Causes of Delay in Road Construction Projects , 2012 .

[27]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[28]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[29]  Khaled Mahmoud El-Gohary,et al.  Factors Influencing Construction Labor Productivity in Egypt , 2014 .

[30]  Núria Agell,et al.  Multiple-Criteria Evaluation for Value Management in Civil Engineering , 2005 .

[31]  Mohammed Ahmed Al-Ghafly Delay in the Construction of public utility projects in Saudi Arabia , 1995 .

[32]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[33]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[34]  Abdulaziz M. Jarkas,et al.  Factors Affecting Construction Labor Productivity in Kuwait , 2012 .

[35]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[36]  K. T. Odusami,et al.  Perceptions of Construction Professionals Concerning Important Skills of Effective Project Leaders , 2002 .

[37]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[38]  Sou-Sen Leu,et al.  A GA-based fuzzy optimal model for construction time-cost trade-off , 2001 .

[39]  Stephen O. Ogunlana,et al.  Large construction projects in developing countries: a case study from Vietnam , 2004 .

[40]  Bambang Trigunarsyah,et al.  Constructability Practices among Construction Contractors in Indonesia , 2004 .

[41]  Sung Ho Park,et al.  Whole life performance assessment: critical success factors , 2009 .

[42]  José Ramón,et al.  Critical Path Definition Using Multicriteria Decision Making: PROMETHEE Method , 2013 .

[43]  Ebrahim H. Mamdani,et al.  An Experiment in Linguistic Synthesis with a Fuzzy Logic Controller , 1999, Int. J. Hum. Comput. Stud..

[44]  Mohammad S. El-Mashaleh,et al.  Empirical Framework for Making the Bid/No-Bid Decision , 2013 .

[45]  H. M. Al-Humaidi,et al.  A fuzzy logic approach to model delays in construction projects using translational models , 2010 .

[46]  S. Ogunlana,et al.  Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .

[47]  Earl Cox,et al.  The fuzzy systems handbook - a practitioner's guide to building, using, and maintaining fuzzy systems , 1994 .

[48]  Ayman H. Al-Momani,et al.  Construction delay: a quantitative analysis , 2000 .