A theoretic and practical framework for scheduling in a stochastic environment
暂无分享,去创建一个
J. Christopher Beck | Thierry Vidal | Julien Bidot | Philippe Laborie | J. Bidot | Philippe Laborie | Thierry Vidal
[1] J. Christopher Beck,et al. Proactive Algorithms for Job Shop Scheduling with Probabilistic Durations , 2011, J. Artif. Intell. Res..
[2] Thierry Vidal,et al. CTP: A New Constraint-Based Formalism for Conditional, Temporal Planning , 2003, Constraints.
[3] Ihsan Sabuncuoglu,et al. Analysis of reactive scheduling problems in a job shop environment , 2000, Eur. J. Oper. Res..
[4] Jan Van Damme,et al. Project scheduling under uncertainty survey and research potentials , 2002 .
[5] J. Christopher Beck,et al. Texture measurements as a basis for heuristic commitment techniques in constraint-directed scheduling , 1999 .
[6] Martin L. Puterman,et al. Markov Decision Processes: Discrete Stochastic Dynamic Programming , 1994 .
[7] John L. Bresina,et al. Just-In-Case Scheduling , 1994, AAAI.
[8] Hoang Trung La. Utilisation d'ordres partiels pour la caractérisation de solution robustes en ordonnancement , 2005 .
[9] Stephen F. Smith,et al. Generating Robust Partial Order Schedules , 2004, CP.
[10] Matt Brown,et al. Invited talk , 2007 .
[11] Mark Wallace,et al. Probe Backtrack Search for Minimal Perturbation in Dynamic Scheduling , 2000, Constraints.
[12] J. Christopher Beck,et al. Slack-based Techniques for Robust Schedules , 2014 .
[13] J. Christopher Beck,et al. Constraint-directed techniques for scheduling alternative activities , 2000, Artif. Intell..
[14] Wpm Wim Nuijten,et al. Time and resource constrained scheduling : a constraint satisfaction approach , 1994 .
[15] Thomas E. Morton,et al. Heuristic scheduling systems : with applications to production systems and project management , 1993 .
[16] Jean-Charles Billaut,et al. Flexibility and Robustness in Scheduling , 2008 .
[17] William J. Cook,et al. A Computational Study of the Job-Shop Scheduling Problem , 1991, INFORMS Journal on Computing.
[18] J. Christopher Beck,et al. Using simuation for execution monitoring and on-line rescheduling with uncertain durations , 2003 .
[19] Rob Sherwood,et al. Using Iterative Repair to Increase the Responsiveness of Planning and Scheduling for Autonomous Spacecraft , 1999 .
[20] Jane N. Hagstrom,et al. Computational complexity of PERT problems , 1988, Networks.
[21] Thomas Schiex,et al. Mixed Constraint Satisfaction: A Framework for Decision Problems under Incomplete Knowledge , 1996, AAAI/IAAI, Vol. 1.
[22] Rachid Alami,et al. Incremental mission allocation to a large team of robots , 1996, Proceedings of IEEE International Conference on Robotics and Automation.
[23] Félix Ingrand,et al. Interleaving Temporal Planning and Execution in Robotics Domains , 2004, AAAI.
[24] J. Christopher Beck,et al. USING CONSTRAINT PROGRAMMING AND SIMULATION FOR EXECUTION MONITORING AND PROGRESSIVE SCHEDULING , 2006 .
[25] P. Brunn,et al. Workshop scheduling using practical (inaccurate) data Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment , 1999 .
[26] M. S. Akturk,et al. A new dominance rule for the total weighted tardiness problem , 1999 .
[27] Fahiem Bacchus,et al. Proceedings of the International Conference on Artificial Intelligence Planning and Scheduling (AIPS 2002) , 2002, AAAI 2002.
[28] David E. Smith,et al. Planning Under Continuous Time and Resource Uncertainty: A Challenge for AI , 2002, AIPS Workshop on Planning for Temporal Domains.
[29] Nicola Muscettola,et al. Computing the Envelope for Stepwise-Constant Resource Allocations , 2002, CP.
[30] Rob Sherwood,et al. Using Iterative Repair to Improve the Responsiveness of Planning and Scheduling , 2000, AIPS.
[31] Nicholas Kushmerick,et al. An Algorithm for Probabilistic Planning , 1995, Artif. Intell..
[32] Nicola Muscettola,et al. HSTS: Integrating Planning and Scheduling , 1993 .
[33] Egon Balas,et al. The Shifting Bottleneck Procedure for Job Shop Scheduling , 1988 .
[34] David W. Hildum. Flexibility in a Knowledge-Based System for Solving Dynamic Resource-Constrained Scheduling Problems , 1994 .
[35] Didier Dubois,et al. The Use of Fuzzy Constraints in Job-Shop Scheduling. , 1994 .
[36] Mark S. Fox,et al. Intelligent Scheduling , 1998 .
[37] Nicola Muscettola,et al. Dynamic Control Of Plans With Temporal Uncertainty , 2001, IJCAI.
[38] Xuemei Wang,et al. Replanning Using Hierarchical Task Network and Operator-Based Planning , 1997, ECP.
[39] Norman Sadeh,et al. MICRO-OPPORTUNISTIC SCHEDULING THE MICRO-BOSS FACTORY SCHEDULER , 1994 .
[40] P. Brunn,et al. Workshop scheduling using practical (inaccurate) data Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach , 1999 .
[41] Robert H. Storer,et al. A Graph-Theoretic Decomposition of the Job Shop Scheduling Problem to Achieve Scheduling Robustness , 1999, Oper. Res..
[42] J. Christopher Beck,et al. A General Framework for Scheduling in a Stochastic Environment , 2007, IJCAI.
[43] Nils J. Nilsson,et al. Principles of Artificial Intelligence , 1980, IEEE Transactions on Pattern Analysis and Machine Intelligence.
[44] P. Baptiste,et al. Edge-Finding Constraint Propagation Algorithms for Disjunctive and Cumulative Scheduling , 1996 .