Process improvement for engineering & maintenance contractors

[1]  A. V. D. Ven,et al.  Alternative forms of fit in contingency theory. , 1985 .

[2]  D. Postmus,et al.  The supply chain of enterprise software , 2009 .

[3]  H.A. Toliyat,et al.  Condition Monitoring and Fault Diagnosis of Electrical Motors—A Review , 2005, IEEE Transactions on Energy Conversion.

[4]  Matthias Holweg,et al.  The genealogy of lean production , 2007 .

[5]  Rajiv Lal,et al.  Compensation plans for single- and multi-product salesforces: an application of the Holmstrom-Milgrom model , 1993 .

[6]  M. Marcelli,et al.  Design and Methods , 2011 .

[7]  Joseph Mathew,et al.  Rotating machinery prognostics. State of the art, challenges and opportunities , 2009 .

[8]  Soo Wook Kim,et al.  Disentangling leanness and agility: An empirical investigation , 2006 .

[9]  Shanlin Yang,et al.  Two-echelon supply chain models: Considering duopolistic retailers' different competitive behaviors , 2006 .

[10]  Jasper Veldman,et al.  Managerial incentives for process innovation , 2008 .

[11]  Zi-Lin He,et al.  Exploration vs. Exploitation: An Empirical Test of the Ambidexterity Hypothesis , 2004, Organ. Sci..

[12]  Mary J. Benner,et al.  Exploitation, Exploration, and Process Management: The Productivity Dilemma Revisited , 2003 .

[13]  Manu Goyal,et al.  Strategic Technology Choice and Capacity Investment Under Demand Uncertainty , 2007, Manag. Sci..

[14]  Jc Johan Wortmann,et al.  Literature survey on condition based maintenance within the process industry , 2008 .

[15]  Anders L. Madsen,et al.  Applications of object-oriented Bayesian networks for condition monitoring, root cause analysis and decision support on operation of complex continuous processes , 2005, Comput. Chem. Eng..

[16]  Nagraj Balakrishnan,et al.  MANAGING ENGINEERING CHANGE: MARKET OPPORTUNITIES AND MANUFACTURING COSTS , 1996 .

[17]  J. Vickers Delegation and the Theory of the Firm , 1985 .

[18]  Roger Jianxin Jiao,et al.  Process Platform Planning for Variety Coordination From Design to Production in Mass Customization Manufacturing , 2007, IEEE Transactions on Engineering Management.

[19]  Jin Jiang,et al.  Erratum to: State-of-the-art methods and results in tool condition monitoring: a review , 2005 .

[20]  David Wilemon,et al.  Software development and new product development: potentials for cross-domain knowledge sharing , 2000, IEEE Trans. Engineering Management.

[21]  Daming Lin,et al.  An approach to signal processing and condition-based maintenance for gearboxes subject to tooth failure , 2004 .

[22]  Rolf Isermann FAULT DIAGNOSIS OF MACHINES VIA PARAMETER ESTIMATION AND KNOWLEDGE PROCESSING , 1992 .

[23]  Alison McKay,et al.  Relating product definition and product variety , 1996 .

[24]  Kosuke Ishii,et al.  Design for variety: developing standardized and modularized product platform architectures , 2002 .

[25]  Sandra Slaughter,et al.  Quality Improvement and Infrastructure Activity Costs in Software Development: A Longitudinal Analysis , 2003, Manag. Sci..

[26]  Stephanie Rosenkranz,et al.  Simultaneous choice of process and product innovation when consumers have a preference for product variety , 2003 .

[27]  Watts S. Humphrey,et al.  Characterizing the software process: a maturity framework , 1988, IEEE Software.

[28]  Olaf Moseler,et al.  Model-based condition monitoring of an actuator system driven by a brushless DC motor , 2001 .

[29]  R. Gibbons Game theory for applied economists , 1992 .

[30]  S. Rajagopalan,et al.  Process Improvement, Learning and Real Options , 2008 .

[31]  Rob Dekkers,et al.  Engineering management and the Order Entry Point , 2006 .

[32]  C. Voss,et al.  Quality management re-visited: a reflective review and agenda for future research , 2002 .

[33]  John S. Hughes,et al.  Current production targets and strategic decisions by corporate managers , 1995 .

[34]  Ali Cinar,et al.  Intelligent process monitoring by interfacing knowledge-based systems and multivariate statistical monitoring , 2000 .

[35]  Rolf Isermann,et al.  Process fault detection based on modeling and estimation methods - A survey , 1984, Autom..

[36]  Renate Fruchter,et al.  An ethnographic study of design knowledge reuse in the architecture, engineering, and construction industry , 2006 .

[37]  Jens Ove Riis,et al.  A situational maintenance model , 1997 .

[38]  Charles H. Fine,et al.  Dynamic Process Improvement , 1989, Oper. Res..

[39]  M. Tseng,et al.  Strategic choice of flexible manufacturing technologies , 2004 .

[40]  Robert Gibbons,et al.  Incentives Between Firms (and Within) , 2005, Manag. Sci..

[41]  J. van der Meer-Kooistra,et al.  Management control of interfirm transactional relationships: the case of industrial renovation and maintenance - Design and methods , 1999 .

[42]  Ludo Gelders,et al.  Maintenance management decision making , 1992 .

[43]  Mark A. Kramer,et al.  A general framework for preventive maintenance optimization in chemical process operations , 1997 .

[44]  Jan Dul,et al.  Case Study Methodology in Business Research , 2007 .

[45]  B. G. Dale The management of engineering change procedure , 1982 .

[46]  A. Jacquemin,et al.  Cooperative and Noncooperative R&D in Duopoly with Spillovers , 1988 .

[47]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[48]  Herbert Negele,et al.  Coping with changes : Causes, findings, and strategies , 2000 .

[49]  Hans Wortmann,et al.  Product platform life cycles: a multiple case study , 2009, Int. J. Technol. Manag..

[50]  Tiaojun Xiao,et al.  Strategic Outsourcing Decisions for Manufacturers that Produce Partially Substitutable Products in a Quantity-Setting Duopoly Situation , 2007, Decis. Sci..

[51]  Amik Garg,et al.  Maintenance management: literature review and directions , 2006 .

[52]  Iris D. Tommelein,et al.  Postponing design processes in unpredictable environments , 2004 .

[53]  Daria Battini,et al.  Remote control and maintenance outsourcing networks and its applications in supply chain management , 2007 .

[54]  R. Andersson,et al.  Similarities and differences between TQM, six sigma and lean , 2006 .

[55]  Jeffrey K. Liker,et al.  The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .

[56]  Grant P. Steven,et al.  VIBRATION-BASED MODEL-DEPENDENT DAMAGE (DELAMINATION) IDENTIFICATION AND HEALTH MONITORING FOR COMPOSITE STRUCTURES — A REVIEW , 2000 .

[57]  D. Gann,et al.  Innovation in project-based, service-enhanced firms: the construction of complex products and systems , 2000 .

[58]  David He,et al.  A segmental hidden semi-Markov model (HSMM)-based diagnostics and prognostics framework and methodology , 2007 .

[59]  J. Wacker A definition of theory: research guidelines for different theory-building research methods in operations management , 1998 .

[60]  J. Stavenuiter Cost effective management control of capital assets: An integrated life cycle management approach , 2002 .

[61]  W. Klingenberg,et al.  Development of a process maturity model for multiple engineering, procurement, construction and maintenance projects in oil & gas asset management , 2006 .

[62]  John Bessant,et al.  FAILURE, UNCERTAINTY AND CONTROL: THE ROLE OF OPERATORS IN A COMPUTER INTEGRATED PRODUCTION SYSTEM , 1985 .

[63]  Kenneth W. Boyer CMMI distilled , 2002, SOEN.

[64]  Steven A. Melnyk,et al.  The scientific theory‐building process: a primer using the case of TQM , 1998 .

[65]  James B. Rawlings,et al.  Parameter estimation for industrial polymerization processes , 2003 .

[66]  A. Davies,et al.  Organisational capabilities and learning in complex product systems: towards repeatable solutions , 2000 .

[67]  Kenneth D. Mackenzie,et al.  Processes and Their Frameworks , 2000 .

[68]  Mikko Ketokivi,et al.  Strategy, uncertainty and the focused factory in international process manufacturing , 2006 .

[69]  Raghunathan Rengaswamy,et al.  A review of process fault detection and diagnosis: Part III: Process history based methods , 2003, Comput. Chem. Eng..

[70]  Chris F. Kemerer,et al.  Environmental Volatility, Development Decisions, and Software Volatility: A Longitudinal Analysis , 2006, Manag. Sci..

[71]  Barrie Dale,et al.  Engineering change administration: the key issues , 1992 .

[72]  Mayuram S. Krishnan,et al.  Effects of Process Maturity on Quality, Cycle Time, and Effort in Software Product Development , 2000 .

[73]  Eun Suk Suh,et al.  Flexible product platforms: framework and case study , 2007, DAC 2006.

[74]  Kathleen M. Eisenhardt,et al.  Theory Building From Cases: Opportunities And Challenges , 2007 .

[75]  Roger G. Schroeder,et al.  A Knowledge Framework Underlying Process Management , 2010, Decis. Sci..

[76]  Mark C. Paulk,et al.  Capability Maturity Model for Software , 2001 .

[77]  Cheryl Gaimon,et al.  The Management of Technology: A Production and Operations Management Perspective , 2008 .

[78]  Claudia Eckert,et al.  Design process improvement : a review of current practice , 2005 .

[79]  Hiroyuki Chuma Increasing complexity and limits of organization in the microlithography industry: implications for science-based industries , 2006 .

[80]  M. Dufwenberg Game theory. , 2011, Wiley interdisciplinary reviews. Cognitive science.

[81]  Timothy W. Simpson,et al.  Assessing and improving commonality and diversity within a product family , 2009, DAC 2006.

[82]  H. Chuma Increasing Complexity and Limits of Organization in the Microlithography Industry : Implications for Japanese Science-based Industries , 2005 .

[83]  Johannes T. Voordijk,et al.  A methodology for developing product platforms in the specific setting of the housebuilding industry , 2006 .

[84]  Paul Nightingale,et al.  The product-process-organisation relationship in complex development projects , 2000 .

[85]  Thiagarajan Ravichandran,et al.  Structural analysis of the impact of knowledge creation and knowledge embedding on software process capability , 2003, IEEE Trans. Engineering Management.

[86]  Venkat Venkatasubramanian,et al.  Prognostic and diagnostic monitoring of complex systems for product lifecycle management: Challenges and opportunities , 2005, Comput. Chem. Eng..

[87]  M. Hoof,et al.  A strategy for advanced condition based maintenance of large generators , 2003, Proceedings: Electrical Insulation Conference and Electrical Manufacturing and Coil Winding Technology Conference (Cat. No.03CH37480).

[88]  Yong Sun,et al.  Mechanical Systems Hazard Estimation Using Condition Monitoring , 2006 .

[89]  Kim B. Clark,et al.  Architectural Innovation: The Reconfiguration of Existing Product Technologies and the Failure of , 1990 .

[90]  Christopher D. Ittner,et al.  AN EXAMINATION OF THE INDIRECT PRODUCTIVITY GAINS FROM QUALITY IMPROVEMENT , 1994 .

[91]  Zhuguo Li,et al.  Recognition of wear mode using multi-variable synthesis approach based on wavelet packet and improved three-line method , 2007 .

[92]  L. Gómez-Mejia,et al.  IS CEO PAY IN HIGH-TECHNOLOGY FIRMS RELATED TO INNOVATION? , 2000 .

[93]  Basim Al-Najjar,et al.  Total quality maintenance: An approach for continuous reduction in costs of quality products , 1996 .

[94]  Phillip J. Lederer,et al.  Economics of total quality management , 1995 .

[95]  M. Naim,et al.  Engineer-to-order supply chain management: A literature review and research agenda , 2009 .

[96]  Eric von Hippel,et al.  How learning by doing is done: problem identification in novel process equipment☆ , 1995 .

[97]  W. Klingenberg,et al.  Condition-based maintenance in punching/blanking of sheet metal , 2008 .

[98]  William L. Berry,et al.  Approaches to mass customization: configurations and empirical validation , 2000 .

[99]  A. A. Alblas,et al.  Platform strategy for complex products and systems , 2011 .

[100]  C. Fershtman,et al.  Equilibrium Incentives in Oligopoly , 1984 .

[101]  Viliam Makis,et al.  Optimal replacement policy and the structure of software for condition‐based maintenance , 1997 .

[102]  David Antory,et al.  Application of a data-driven monitoring technique to diagnose air leaks in an automotive diesel engine: A case study , 2007 .

[103]  Uday Kumar,et al.  Reliability improvement through alternative designs - A case study , 2007, Reliab. Eng. Syst. Saf..

[104]  Andrew K. S. Jardine,et al.  Optimizing a mine haul truck wheel motors’ condition monitoring program Use of proportional hazards modeling , 2001 .

[105]  Daniel A. Levinthal,et al.  Demand Heterogeneity and Technology Evolution: Implications for Product and Process Innovation , 2001, Manag. Sci..

[106]  Nils Hauenschild On the role of input and output spillovers when R&D projects are risky , 2003 .

[107]  Farrokh Mistree,et al.  Product platform design: method and application , 2001 .

[108]  J. L. Maryak,et al.  Automated system monitoring and diagnosis via singular value decomposition , 1997, Autom..

[109]  Andrew K. S. Jardine,et al.  Health state evaluation of an item: A general framework and graphical representation , 2008, Reliab. Eng. Syst. Saf..

[110]  Per Joakim Agrell,et al.  Incentive plans for Productive Efficiency, Innovation and Learning , 2002 .

[111]  Peter T. Ward,et al.  Lean manufacturing: context, practice bundles, and performance , 2003 .

[112]  Janos Gertler,et al.  A new structural framework for parity equation-based failure detection and isolation , 1990, Autom..

[113]  Yi-Guang Li,et al.  Performance-analysis-based gas turbine diagnostics: A review , 2002 .

[114]  Ramine Nikoukhah,et al.  Guaranteed Active Failure Detection and Isolation for Linear Dynamical Systems , 1998, Autom..

[115]  Roger Ivor Grosvenor,et al.  Process plant condition monitoring and fault diagnosis , 1998 .

[116]  Hans Wortmann,et al.  Comparison of information systems for engineer-to-order and make-to-stock situations , 1995 .

[117]  Hans Wortmann,et al.  Impact of product platforms on lean production systems: evidence from industrial machinery manufacturing , 2012, Int. J. Technol. Manag..

[118]  Christoph H. Loch,et al.  Implementing a strategy-driven performance measurement system for an applied research group , 2002 .

[119]  M. Hosein Faltah Process audit: from compliance to self-management , 1997 .

[120]  Ian Hipkin,et al.  TQM and BPR: lessons for maintenance management , 2000 .

[121]  Jan Olhager,et al.  Strategic positioning of the order penetration point , 2003 .

[122]  Christian Hicks,et al.  Product life cycle management in engineer-to-order industries , 2009, Int. J. Technol. Manag..

[123]  Andrej Atrens,et al.  Strategic maintenance management , 2002 .

[124]  R. Keith Mobley,et al.  An introduction to predictive maintenance , 1989 .

[125]  M. Engwall No project is an island: linking projects to history and context , 2003 .

[126]  Fran Ackermann,et al.  The Effects of Design Changes and Delays on Project Costs , 1995 .

[127]  Andrew K. S. Jardine,et al.  Data management for CBM optimization , 2006 .

[128]  J. Whitney Case Study Research , 1999 .

[129]  Jwm Will Bertrand,et al.  Production control in engineer-to-order firms , 1993 .

[130]  Raghunathan Rengaswamy,et al.  A review of process fault detection and diagnosis: Part II: Qualitative models and search strategies , 2003, Comput. Chem. Eng..

[131]  Li Jiang,et al.  Capacity Investment Under Postponement Strategies, Market Competition, and Demand Uncertainty , 2008, Manag. Sci..

[132]  Ilya Segal,et al.  Solutions manual for Microeconomic theory : Mas-Colell, Whinston and Green , 1997 .

[133]  Robert D. Klassen,et al.  The process management triangle: An empirical investigation of process trade-offs , 2007 .

[134]  K. Ferdows POM Forum: Transfer of Changing Production Know‐How , 2006 .

[135]  John C. Anderson,et al.  Maturity and its impact on new product development project performance , 2001 .

[136]  Richard T. Symons,et al.  A TOTAL QUALITY MANAGEMENT‐BASED INCENTIVE SYSTEM SUPPORTING TOTAL QUALITY MANAGEMENT IMPLEMENTATION , 2009 .

[137]  Serguei Netessine,et al.  Can We All Get Along? Incentive Contracts to Bridge the Marketing and Operations Divide , 2007 .

[138]  Luk N. Van Wassenhove,et al.  Knowledge Driven Quality Improvement , 1998 .

[139]  Bernardo Tormos,et al.  Analytical approach to wear rate determination for internal combustion engine condition monitoring based on oil analysis , 2003 .

[140]  Markus Christen,et al.  Research Note - Cost Uncertainty Is Bliss: The Effect of Competition on the Acquisition of Cost Information for Pricing New Products , 2005, Manag. Sci..

[141]  P. Clarkson,et al.  Predicting change propagation in complex design , 2004 .

[142]  van der Jeltje Meer-Kooistra,et al.  Management control of interfirm transactional relationships , 1999 .

[143]  Christoph H. Loch,et al.  Accelerating the process of engineering change orders: capacity and congestion effects , 1999 .

[144]  Pietro Romano,et al.  Finn-Power Italia Develops and Implements a Method to Cope with High Product Variety and Frequent Modifications , 2005, Interfaces.

[145]  Liliane Pintelon,et al.  Evaluating the effectiveness of maintenance strategies , 2006 .

[146]  David F. Larcker,et al.  Total Quality Management and the Choice of Information and Reward Systems , 1995 .

[147]  Nelson P. Repenning,et al.  Capability Traps and Self-Confirming Attribution Errors in the Dynamics of Process Improvement , 2002 .

[148]  Manuel E. Sosa A structured approach to predicting and managing technical interactions in software development , 2008 .

[149]  Joanne M. Sulek,et al.  Measuring performance in multi-stage service operations: An application of cause selecting control charts , 2006 .

[150]  Basim Al-Najjar,et al.  Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making , 2003 .

[151]  George Harhalakis Engineering changes for made-to-order products: How an MRP II system should handle them , 1986 .

[152]  Roger G. Schroeder,et al.  Six sigma: A goal-theoretic perspective , 2003 .

[153]  Jean Hartley,et al.  Case study research , 2004 .

[154]  Ray Beebe,et al.  Predictive Maintenance of Pumps Using Condition Monitoring , 2004 .

[155]  Benoît Iung,et al.  Formalisation of a new prognosis model for supporting proactive maintenance implementation on industrial system , 2008, Reliab. Eng. Syst. Saf..

[156]  E. Peter Carden,et al.  Vibration Based Condition Monitoring: A Review , 2004 .

[157]  R. Yin Case Study Research: Design and Methods , 1984 .

[158]  Liliane Pintelon,et al.  Maintenance concept development: A case study , 2004 .

[159]  Jan Riezebos,et al.  Lean Production and information technology: Connection or contradiction? , 2009, Comput. Ind..

[160]  R. Grant,et al.  Environments: Organizational Capability as Knowledge Integration , 2022 .

[161]  D. Larcker,et al.  The Performance Effects of Process Management Techniques , 1997 .

[162]  Alan C. Brent,et al.  Asset life cycle management : towards improving physical asset performance in the process industry , 2005 .

[163]  Nicolaj Siggelkow Persuasion with case studies , 2007 .

[164]  Tyson R. Browning,et al.  RECONCEPTUALIZING THE EFFECTS OF LEAN ON PRODUCTION COSTS WITH EVIDENCE FROM THE F-22 PROGRAM , 2009 .

[165]  Alain Abran,et al.  Software Maintenance Maturity Model (SMmm): the software maintenance process model , 2005, J. Softw. Maintenance Res. Pract..

[166]  Kevin Zhu,et al.  Strategic Decisions of New Technology Adoption Under Asymmetric Information: A Game Theoretic Model , 2003, Decis. Sci..

[167]  Michael Hobday,et al.  Innovation in complex products and system , 2000 .

[168]  Richard Turner,et al.  CMMI Distilled: A Practical Introduction to Integrated Process Improvement , 2001 .

[169]  Jun Wu,et al.  Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process , 2007 .

[170]  Pa Paul Konijnendijk Coordinating marketing and manufacturing in ETO companies , 1994 .

[171]  D. Mowery,et al.  Process Innovation and Learning by Doing in Semiconductor Manufacturing , 1998 .

[172]  Jc Johan Wortmann Production management systems for one-of-a-kind products , 1992 .

[173]  Diego J. Pedregal,et al.  Unobserved Component models applied to the assessment of wear in railway points: A case study , 2007, Eur. J. Oper. Res..

[174]  Raghunathan Rengaswamy,et al.  A review of process fault detection and diagnosis: Part I: Quantitative model-based methods , 2003, Comput. Chem. Eng..

[175]  S. D. Wu,et al.  Incentive Schemes for Semiconductor Capacity Allocation: A Game Theoretic Analysis , 2005 .

[176]  Laura Swanson An empirical study of the relationship between production technology and maintenance management , 1997 .

[177]  S. Rahman Reliability Engineering and System Safety , 2011 .

[178]  Gérard P. Cachon,et al.  Game Theory in Supply Chain Analysis , 2004 .

[179]  Koji Ishibashi,et al.  Strategic delegation under quality competition , 2001 .

[180]  I. Alsyouf The role of maintenance in improving companies' productivity and profitability , 2002 .

[181]  P. John Clarkson,et al.  Planning development processes for complex products , 2010 .

[182]  Wolter J. Fabrycky,et al.  Systems engineering and analysis , 1981 .

[183]  Michael Kopel,et al.  R&D in a strategic delegation game revisited: a note , 2006 .

[184]  Sudheer Gupta,et al.  Process Innovation, Product Differentiation, and Channel Structure: Strategic Incentives in a Duopoly , 1998 .

[185]  Christopher F. Earl,et al.  An analysis of company structure and business processes in the capital goods industry in the UK , 2000, IEEE Trans. Engineering Management.

[186]  P. Jonsson Company-wide integration of strategic maintenance: An empirical analysis , 1999 .

[187]  Cheryl Gaimon,et al.  A framework for process change , 2002, IEEE Trans. Engineering Management.

[188]  S. Kotha Mass Customization: The New Frontier in Business Competition , 1992 .

[189]  H. Voordijk,et al.  Matching supply networks to a modular product architecture in the house-building industry , 2009 .

[190]  P. John Clarkson,et al.  Supporting change processes in design: Complexity, prediction and reliability , 2006, Reliab. Eng. Syst. Saf..

[191]  Basim Al-Najjar,et al.  Production, Manufacturing and Logistics Enhancing a companys profitability and competitiveness using integrated vibration-based maintenance: A case study , 2004 .

[192]  Giovanna Vianello,et al.  ENGINEERING CHANGES DURING THE SERVICE PHASE , 2008 .

[193]  Laura Swanson,et al.  An information-processing model of maintenance management , 2003 .

[194]  Bas Jeroen Oosterman,et al.  Improving product development projects by matching product architecture and organization , 2001 .

[195]  Jack R. Meredith,et al.  Building operations management theory through case and field research , 1998 .

[196]  S. Whang,et al.  On manufacturing/marketing incentives , 1991 .

[197]  Sridhar Balasubramanian,et al.  When Not All Conflict Is Bad: Manufacturing-Marketing Conflict and Strategic Incentive Design , 2004, Manag. Sci..

[198]  Govert Vroom,et al.  Ownership form, Managerial Incentives, and the Intensity Of Rivalry , 2007 .

[199]  Barry M. Wise,et al.  The process chemometrics approach to process monitoring and fault detection , 1995 .

[200]  G. Gaalman Optimal Aggregation of Multi-Item Production Smoothing Models , 1978 .

[201]  Mitchell M. Tseng,et al.  Product family modeling for mass customization , 1998 .

[202]  Dan B. Rinks,et al.  Maintenance project management in the process industries: A look at the realities , 1993 .

[203]  Sanjoy Ghose,et al.  Motivating Retail Marketing Effort: Optimal Contract Design , 2009 .

[204]  Cheryl Gaimon,et al.  Improving Manufacturing Performance Through Process Change and Knowledge Creation , 2000 .

[205]  Ammon Salter,et al.  Learning and Innovation Management in Project-Based, Service-Enhanced Firms , 1998 .

[206]  Christoph H. Loch,et al.  Incentive Contracts in Projects with Unforeseeable Uncertainty , 2009 .

[207]  Mary Beth Chrissis,et al.  CMMI: Guidelines for Process Integration and Product Improvement , 2003 .

[208]  E. Naveh Formality and discretion in successful R&D projects , 2007 .

[209]  Elliott N. Weiss,et al.  GUIDELINES FOR IMPLEMENTING PREDICTIVE MAINTENANCE , 2009 .

[210]  C.James Li,et al.  Model-based condition index for tracking gear wear and fatigue damage , 2000 .

[211]  Niklas Sundgren,et al.  Introducing Interface Management in New Product Family Development , 1999 .

[212]  P. Adler The Evolving Object of Software Development , 2005 .

[213]  Graham Winch,et al.  Models of manufacturing and the construction process: the genesis of re-engineering construction , 2003 .

[214]  Colin Herron,et al.  A methodology for developing sustainable quantifiable productivity improvement in manufacturing companies , 2006 .

[215]  Claudia Eckert,et al.  Engineering change: drivers, sources and approaches in industry , 2009 .

[216]  Yan Gao,et al.  An application of DPCA to oil data for CBM modeling , 2006, Eur. J. Oper. Res..

[217]  Steven A. Melnyk,et al.  Metrics and performance measurement in operations management: dealing with the metrics maze , 2004 .

[218]  Basim Al-Najjar,et al.  The lack of maintenance and not maintenance which costs: A model to describe and quantify the impact of vibration-based maintenance on company's business , 2007 .

[219]  Lauri Koskela,et al.  Should project management be based on theories of economics or production? , 2006 .

[220]  C. W. Gits Design of maintenance concepts , 1992 .

[221]  Ludwig Bstieler,et al.  The Moderating Effect of Environmental Uncertainty on New Product Development and Time Efficiency , 2005 .

[222]  Christian Hicks,et al.  Supply chain management: A strategic issue in engineer to order manufacturing , 2000 .

[223]  Ian Hipkin Knowledge and IS implementation: case studies in physical asset management , 2001 .

[224]  J. Moubray Reliability-Centered Maintenance , 1991 .

[225]  Sendil K. Ethiraj,et al.  Where Do Capabilities Come from and How Do They Matter? A Study in the Software Services Industry , 2005 .

[226]  Basim Al-Najjar,et al.  Improving effectiveness of manufacturing systems using total quality maintenance , 2000 .

[227]  M.Carmen Carnero Moya The control of the setting up of a predictive maintenance programme using a system of indicators , 2004 .

[228]  Albert H. C. Tsang,et al.  Sourcing strategies of facilities management , 2004 .

[229]  Matthew A. Waller,et al.  Competitive incentives for manufacturing flexibility , 1992 .

[230]  Jc Jan Fransoo,et al.  Operations management research in process industries , 2006 .

[231]  Luis F. Alarcón,et al.  Construction process improvement methodology for construction projects , 1998 .

[232]  Giovani J.C. da Silveira,et al.  Mass customization: Literature review and research directions , 2001 .

[233]  L. N. Van Wassenhove,et al.  An integrated and structured approach to improve maintenance , 1995 .

[234]  Srinivas Kumar Pinjala,et al.  An empirical investigation on the relationship between business and maintenance strategies , 2006 .

[235]  Manabu Kano,et al.  A new multivariate statistical process monitoring method using principal component analysis , 2001 .

[236]  Hongtao Zhang VERTICAL INFORMATION EXCHANGE IN A SUPPLY CHAIN WITH DUOPOLY RETAILERS , 2002 .

[237]  Ian Hipkin,et al.  A study of maintenance technology implementation , 1995 .

[238]  Andrew Davies,et al.  Building Project Capabilities: From Exploratory to Exploitative Learning , 2004 .

[239]  Ossama Salem,et al.  Lean Construction: From Theory to Implementation , 2006 .

[240]  L. Pintelon,et al.  A framework for maintenance concept development , 2002 .

[241]  Dennis Muntslag,et al.  Managing customer order driven engineering : an interdisciplinary and design oriented approach , 1993 .

[242]  Richard C.M. Yam,et al.  Intelligent Predictive Decision Support System for Condition-Based Maintenance , 2001 .

[243]  J. Bertrand,et al.  Operations management research methodologies using quantitative modeling , 2002 .

[244]  Knut Øien,et al.  Improved quality of input data for maintenance optimization using expert judgment , 1998 .

[245]  Marjan Sarshar,et al.  SPICE: a business process diagnostics tool for construction projects , 2000 .

[246]  Fausto Pedro García Márquez,et al.  Wear assessment employing remote condition monitoring: a case study , 2003 .

[247]  A. J. Morris,et al.  Monitoring the performance of the paper making process , 1999 .

[248]  Rajiv D. Banker,et al.  Economics of operations management: A research perspective , 1995 .

[249]  C. Terwiesch,et al.  Managing the Process of Engineering Change Orders: The Case of the Climate Control System in Automobile Development , 1999 .

[250]  Kevin P. Grant,et al.  Project management maturity: an assessment of project management capabilities among and between selected industries , 2006, IEEE Transactions on Engineering Management.

[251]  Sunantha Teyarachakul,et al.  Learning effects on maintenance outsourcing , 2009, Eur. J. Oper. Res..

[252]  Constantine Andriopoulos,et al.  Exploitation-Exploration Tensions and Organizational Ambidexterity: Managing Paradoxes of Innovation , 2009, Organ. Sci..

[253]  Noushin Ashrafi,et al.  The impact of software process improvement on quality: in theory and practice , 2003, Inf. Manag..

[254]  Sunder Kekre,et al.  Engineering changes and time delays: A field investigation , 1992 .

[255]  Paul Weston,et al.  Failure analysis and diagnostics for railway trackside equipment , 2007 .

[256]  B. Williams,et al.  Operations management. , 2001, Optometry.

[257]  Benjamin S. Blanchard An enhanced approach for implementing total productive maintenance in the manufacturing environment , 1994 .

[258]  Richard Harris,et al.  Cost Reduction, Incentives and Market Structure , 1976 .

[259]  Hmh Herman Hegge,et al.  Generic bill-of-material: a new product model , 1991 .

[260]  Adolfo Crespo Márquez,et al.  Contemporary maintenance management: process, framework and supporting pillars , 2006 .

[261]  Jc Johan Wortmann,et al.  Customer-driven manufacturing , 1996 .

[262]  MaCarmen Carnero An evaluation system of the setting up of predictive maintenance programmes , 2006 .

[263]  George Q. Huang,et al.  Current practices of engineering change management in UK manufacturing industries , 1999 .

[264]  Y. Han,et al.  Condition Monitoring Techniques for Electrical Equipment: A Literature Survey , 2002, IEEE Power Engineering Review.

[265]  P. Jonsson Towards an holistic understanding of disruptions in Operations Management , 2000 .

[266]  Yimin Zhan,et al.  Robust detection of gearbox deterioration using compromised autoregressive modeling and Kolmogorov–Smirnov test statistic—Part I: Compromised autoregressive modeling with the aid of hypothesis tests and simulation analysis , 2007 .

[267]  J. March Exploration and exploitation in organizational learning , 1991, STUDI ORGANIZZATIVI.

[268]  Peter Axel Nielsen,et al.  Competing values in software process improvement: an assumption analysis of CMM from an organizational culture perspective , 2003, IEEE Trans. Engineering Management.

[269]  Gerald M. Knapp,et al.  Some aspects of measuring maintenance performance in the process industry , 1998 .

[270]  S. Kotha Mass customization: Implementing the emerging paradigm for competitive advantage , 1995 .

[271]  Samuel H. Huang,et al.  System health monitoring and prognostics — a review of current paradigms and practices , 2006 .

[272]  Philip A. Scarf,et al.  On the application of a model of condition-based maintenance , 2000, J. Oper. Res. Soc..

[273]  L. Swanson Linking maintenance strategies to performance , 2001 .

[274]  M. S. Krishnan,et al.  An Empirical Analysis of Productivity and Quality in Software Products , 2000 .

[275]  Cheryl Gaimon,et al.  Managing Knowledge-Based Resource Capabilities Under Uncertainty , 2004, Manag. Sci..

[276]  K. Eisenhardt Agency Theory: An Assessment and Review , 1989 .

[277]  P. De Groote,et al.  Maintenance performance analysis: a practical approach , 1995 .

[278]  P. John Clarkson,et al.  Change and customisation in complex engineering domains , 2004 .

[279]  Gary Klein,et al.  An exploration of the relationship between software development process maturity and project performance , 2004, Inf. Manag..

[280]  Basim Al-Najjar,et al.  Enhancing a company's profitability and competitiveness using integrated vibration-based maintenance: A case study , 2004, Eur. J. Oper. Res..

[281]  A. Mas-Colell,et al.  Microeconomic Theory , 1995 .

[282]  W. Klingenberg,et al.  Typology of condition based maintenance , 2011 .

[283]  Paul Braiden,et al.  Using business process re-engineering for the development of production efficiency in companies making engineered to order products , 2004 .

[284]  David Upton,et al.  Alternative methods of learning and process improvement in manufacturing , 1998 .

[285]  Paul R. Carlile,et al.  Into the black box: the knowledge transformation cycle , 2003, IEEE Engineering Management Review.

[286]  Karl Reichard,et al.  A FRAMEWORK FOR NEXT GENERATION MACHINERY MONITORING AND DIAGNOSTICS , 2002 .

[287]  Jianbo Zhang,et al.  R&D in a strategic delegation game , 1997 .

[288]  Paul R. Carlile,et al.  Into the black box: the knowledge transformation cycle , 2003 .

[289]  A. H. Christer,et al.  Modelling of condition based maintenance at the coal face , 1991 .

[290]  Albert H. C. Tsang Strategic dimensions of maintenance management , 2002 .

[291]  Jasper Veldman,et al.  Applicability of the capability maturity model for engineer-to-order firms , 2009, Int. J. Technol. Manag..

[292]  Marc H. Meyer,et al.  The power of product platforms : building value and cost leadership , 1997 .

[293]  R. Hayes Operations, Strategy and Technology: Pursuing the Competitive Edge , 2011 .

[294]  Jaime Campos,et al.  Development in the application of ICT in condition monitoring and maintenance , 2009, Comput. Ind..

[295]  Fangruo Chen,et al.  Salesforce Incentives, Market Information, and Production/Inventory Planning , 2005, Manag. Sci..

[296]  Betul Lus,et al.  Measuring the Impact of Increased Product Substitution on Pricing and Capacity Decisions Under Linear Demand Models , 2009 .

[297]  M. Hobday Product complexity, innovation and industrial organisation , 1998 .

[298]  David M. McCutcheon,et al.  Conducting case study research in operations management , 1993 .

[299]  Daming Lin,et al.  A review on machinery diagnostics and prognostics implementing condition-based maintenance , 2006 .

[300]  A. Salter,et al.  Exploring the capital goods economy: complex product systems in the UK , 2004 .

[301]  Zhongxiao Peng,et al.  An integrated approach to fault diagnosis of machinery using wear debris and vibration analysis , 2003 .

[302]  Benoît Iung,et al.  On the concept of e-maintenance: Review and current research , 2008, Reliab. Eng. Syst. Saf..

[303]  B. K. Sinha Trend prediction from steam turbine responses of vibration and eccentricity , 2002 .

[304]  Lee W. Schruben,et al.  External Change in Large Engineering Design Projects: The Role of the Client , 2006, IEEE Transactions on Engineering Management.

[305]  Tony Unsworth,et al.  Proceedings of the Institution of Mechanical Engineers Part H. , 2008, Proceedings of the Institution of Mechanical Engineers. Part H, Journal of engineering in medicine.

[306]  Kari Laakso,et al.  Value-driven maintenance planning for a production plant , 2009, Reliab. Eng. Syst. Saf..

[307]  Liliane Pintelon,et al.  CIBOCOF: A framework for industrial maintenance concept development , 2009 .

[308]  Albert H. C. Tsang,et al.  Condition-based maintenance: tools and decision making , 1995 .

[309]  Giacomo Bonanno,et al.  Intensity of competition and the choice between product and process innovation , 1998 .

[310]  Govert Vroom,et al.  Organizational Design and the Intensity of Rivalry , 2006, Manag. Sci..

[311]  Edward A. Silver,et al.  OM Forum: Process Management Instead of Operations Management , 2004, Manuf. Serv. Oper. Manag..

[312]  Byung-Min Kim,et al.  Development of an analytical scheme to predict the need for tool regrinding in shearing processes , 2000 .

[313]  Jack R. Meredith,et al.  Automating the factory: theory versus practice , 1987 .