Setting safety leadtimes for purchased components in assembly systems
暂无分享,去创建一个
[1] Candace Arai Yano. Stochastic leadtimes in two-level distribution type networks , 1987 .
[2] D. Clay Whybark,et al. MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .
[3] Graham K. Rand,et al. Decision Systems for Inventory Management and Production Planning , 1979 .
[4] Candace Aria Yano,et al. Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs , 1987 .
[5] William H. Press,et al. Numerical recipes , 1990 .
[6] James H. Bookbinder,et al. Setting Job-Shop Due-Dates with Service-Level Constraints , 1985 .
[7] Wing Suen,et al. The Structure of Economics: A Mathematical Analysis , 1978 .
[8] John J. Kankt,et al. Manufacturing systems with forbidden early order departure , 1984 .
[9] Candace Aral Yano,et al. Stochastic Leadtimes in Two-Level Assembly Systems , 1987 .
[10] Stephen C. Graves,et al. Safety stocks in manufacturing systems , 1987 .
[11] B. W. Taylor,et al. A simulation-based experimental investigation of supply/timing uncertainty in MRP systems , 1984 .
[12] Candace Arai Yano,et al. Planned Leadtimes For Serial Production Systems , 1987 .