Where are we with the current shutdown
暂无分享,去创建一个
Many conference series have adopted the same The first shutdown of the LHC machine started on the 17th of November 2008. In addition to typical shut-down interventions and the works already foreseen (e.g. phase 1 collimator installation), some additional consolidation work is needed. On top of this, comes the work caused by the 19th September incident and the subsequent tests carried out in November and December. This talk will give an overview of the activities currently planned and the key drivers for overall length of the shutdown, highlighting the critical points.