A network-based shortest route model for parallel disassembly line balancing problem
暂无分享,去创建一个
[1] Surendra M. Gupta,et al. A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem , 2016, Ann. Oper. Res..
[2] Surendra M. Gupta,et al. Balancing a sequence-dependent disassembly line using simulated annealing algorithm , 2013 .
[3] Surendra M. Gupta,et al. Disassembly line in product recovery , 2002 .
[4] Manoj Kumar Tiwari,et al. A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem , 2008 .
[5] Mehmet Ali Ilgin,et al. Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.
[6] Ihsan Sabuncuoglu,et al. Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph , 2009 .
[7] Surendra M. Gupta,et al. Reverse Supply Chains : Issues and Analysis , 2013 .
[8] Alfred J.D. Lambert,et al. Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling , 2004 .
[9] R. W. Sierenberg. An Algorithm for the Line Balancing Problem , 1972 .
[10] Hadi Gökçen,et al. Balancing parallel assembly lines with precise and fuzzy goals , 2010 .
[11] Surendra M. Gupta,et al. Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem , 2007 .
[12] Hadi Gökçen,et al. A Network Model for Parallel Line Balancing Problem , 2007 .
[13] Surendra M. Gupta,et al. Ant colony optimization for sequence‐dependent disassembly line balancing problem , 2013 .
[14] Alexandre Dolgui,et al. Disassembly Line Balancing and Sequencing under Uncertainty , 2014 .
[15] Shwetank Avikal,et al. A New U-Shaped Heuristic for Disassembly Line Balancing Problems , 2014 .
[16] Yixiong Feng,et al. A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .
[17] Armin Scholl,et al. A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..
[18] Alexandre Dolgui,et al. Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem , 2014 .
[19] Nils Boysen,et al. Designing parallel assembly lines with split workplaces: Model and optimization procedure , 2009 .
[20] Turan Paksoy,et al. Mixed model disassembly line balancing problem with fuzzy goals , 2013 .
[21] Alexandre Dolgui,et al. A sample average approximation method for disassembly line balancing problem under uncertainty , 2014, Comput. Oper. Res..
[22] Askiner Gungor,et al. A solution approach to the disassembly line balancing problem in the presence of task failures , 2001 .
[23] Alexandre Dolgui,et al. Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts , 2013, APMS.
[24] Alexandre Dolgui,et al. A Stochastic Formulation of the Disassembly Line Balancing Problem , 2012, APMS.
[25] Surendra M. Gupta,et al. River Formation Dynamics Approach for Sequence-Dependent Disassembly Line Balancing Problem , 2013 .
[26] Christian Ullerich. Advanced Disassembly Planning , 2014 .
[27] Rajeev Jain,et al. A Fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems , 2014 .
[28] Hadi Gökçen,et al. Balancing of parallel assembly lines , 2006 .
[29] Levent Kandiller,et al. Profit-oriented disassembly-line balancing , 2008 .
[30] Hadi Gökçen,et al. Shortest-route formulation of mixed-model assembly line balancing problem , 1999, Eur. J. Oper. Res..
[31] Surendra M. Gupta,et al. A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..
[32] Surendra M. Gupta,et al. Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem , 2013, Expert Syst. Appl..
[33] Askiner Güngör. Evaluation of connection types in design for disassembly (DFD) using analytic network process , 2006, Comput. Ind. Eng..
[34] Ayyuce Aydemir-Karadag,et al. Multi-objective optimization of stochastic disassembly line balancing with station paralleling , 2013, Comput. Ind. Eng..
[35] Surendra M. Gupta,et al. Deterministic hybrid and stochastic combinatorial optimization treatments of an electronic product disassembly line , 2006 .
[36] Surendra M. Gupta,et al. Operations Planning Issues in an Assembly/Disassembly Environment , 1994 .
[37] Mehmet Ali Ilgin. The disassembly line: balancing and modeling, by S.M. McGovern and S.M. Gupta , 2011 .
[38] J.-M. Henrioud,et al. APPLYING EQUAL PILES APPROACH TO DISASSEMBLY LINE BALANCING PROBLEM , 2005 .
[39] Askiner Gungor,et al. Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .
[40] Ajd Fred Lambert,et al. Disassembly sequencing: A survey , 2003 .
[41] Abe Zeid,et al. Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning , 2014, J. Intell. Manuf..
[42] Can Akkan,et al. Task-failure-driven rebalancing of disassembly lines , 2012 .
[43] Surendra M. Gupta,et al. Disassembly line balancing. , 2007 .
[44] Surendra M. Gupta,et al. A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem , 2013, The International Journal of Advanced Manufacturing Technology.
[45] Surendra M. Gupta,et al. A tabu search algorithm for balancing a sequence-dependent disassembly line , 2014 .