An FPTAS for uniform machine scheduling to minimize makespan with linear deterioration

This paper consider m uniform (parallel) machine scheduling with linear deterioration to minimize the makespan. In an uniform machine environment, all machines have different processing speeds. Linear deterioration means that job’s actual processing time is a linear increasing function on its execution starting time. We propose a fully polynomial-time approximation scheme (FPTAS) to show the problem is NP-hard in the ordinary sense.

[1]  Sid Browne,et al.  Scheduling Deteriorating Jobs on a Single Processor , 1990, Oper. Res..

[2]  T. C. Edwin Cheng,et al.  Single machine scheduling with step-deteriorating processing times , 2001, Eur. J. Oper. Res..

[3]  Shijie Sun,et al.  Scheduling linear deteriorating jobs with rejection on a single machine , 2009, Eur. J. Oper. Res..

[4]  C. T. Ng,et al.  A note on a fully polynomial-time approximation scheme for parallel-machine scheduling with deteriorating jobs , 2007 .

[5]  Gur Mosheiov,et al.  Scheduling jobs under simple linear deterioration , 1994, Comput. Oper. Res..

[6]  Gur Mosheiov,et al.  V-Shaped Policies for Scheduling Deteriorating Jobs , 1991, Oper. Res..

[7]  Christopher D. Geiger,et al.  A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration , 2010, Eur. J. Oper. Res..

[8]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[9]  Wieslaw Kubiak,et al.  A Fully Polynomial Approximation Scheme for the Weighted Earliness-Tardiness Problem , 1999, Oper. Res..

[10]  Zhi-Long Chen Parallel Machine Scheduling with Time Dependent Processing Times , 1996, Discret. Appl. Math..

[11]  Bahram Alidaee,et al.  Scheduling with time dependent processing times: Review and extensions , 1999, J. Oper. Res. Soc..

[12]  Bertrand M. T. Lin,et al.  A concise survey of scheduling with time-dependent processing times , 2004, Eur. J. Oper. Res..

[13]  Wieslaw Kubiak,et al.  A Fully Polynomial Approximation Scheme for Minimizing Makespan of Deteriorating Jobs , 1998, J. Heuristics.

[14]  Jatinder N. D. Gupta,et al.  Single facility scheduling with nonlinear processing times , 1988 .

[15]  T. C. Edwin Cheng,et al.  Parallel-machine scheduling with simple linear deterioration to minimize total completion time , 2008, Eur. J. Oper. Res..

[16]  Béla Bollobás,et al.  Erratum to “Parallel machine scheduling with time dependent processing times” [Discrete Appl. Math. 70 (1996) 81–93] , 1997 .

[17]  Gur Mosheiov,et al.  Multi-Machine Scheduling With Linear Deterioration , 1998 .

[18]  T. C. Edwin Cheng,et al.  Due-date assignment and single machine scheduling with deteriorating jobs , 2004, J. Oper. Res. Soc..