Height and construction costs of buildings in Hong Kong
暂无分享,去创建一个
[1] M. Skitmore,et al. 2 The relationship between construction price and height , 2005 .
[2] Mohan M. Kumaraswamy,et al. A study of the factors affecting construction durations in Hong Kong , 1995 .
[3] Srinath Perera,et al. Cost Studies of Buildings , 2004 .
[4] Peter Edward Bathurst,et al. Building cost control techniques and economics , 1973 .
[5] Douglas J. Ferry. Cost Planning of Buildings , 1980 .
[6] Gary D. Holt,et al. A methodology for predicting the performance of construction contractors , 1995 .
[7] Arthur W. T. Leung,et al. Prediction of hoisting time for tower cranes for public housing construction in Hong Kong , 1999 .
[8] Gary David Holt,et al. Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK, German and French contractors , 1999 .
[9] Gary David Holt,et al. Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .
[10] Peter E.D. Love,et al. Logistics of materials handling methods in high rise in‐situ construction , 1999 .
[11] G. D. Holt,et al. Factors influencing U.K. construction clients' choice of contractor , 1994 .
[12] Gary David Holt,et al. Construction resource/method factors influencing productivity for high rise concrete construction , 1999 .