Method selection: a conceptual framework for public sector PPP selection

The purpose of this paper is to establish a conceptual framework to assist decision makers in identifying an appropriate decision-supporting method (DSM) to evaluate public-private partnership (PPP) contract types in a disciplined and systematic manner.,A systematic literature review was conducted to compare and analyse DSMs in construction procurement processes, and explore the benefits and limitations of using DSMs. A conceptual framework is then developed to accommodate client characteristics when selecting DSM in a PPP context. An example was obtained to illustrate the implementation of the proposed framework.,DSMs employed in the procurement method selection are identified by using a systemic literature review. The benefits and limitations of each DSM are established and comparisons of DSMs are provided to fit the client characteristics and a conceptual framework is developed to assist decision makers in choosing DSM for contract selection.,This paper demonstrates a link between DSMs and PPP contracts which adds value at the stage of PPP contract evaluation. Also, the proposed framework sheds some light on an important aspect of the public sector to consider the improvement of current policies (PPP framework/guideline).

[1]  Sai On Cheung,et al.  A fuzzy sets model for construction dispute evaluation , 2001 .

[2]  M. Lewis,et al.  Are Public-Private Partnerships a Healthy Option? A Systematic Literature Review , 2014, Social science & medicine.

[3]  Hemanta Doloi,et al.  Empirical Analysis of Traditional Contracting and Relationship Agreements for Procuring Partners in Construction Projects , 2013 .

[4]  Sai On Cheung,et al.  An analytical hierarchy process based procurement selection method , 2001 .

[5]  Prakash J. Singh,et al.  Supply chain management: a structured literature review and implications for future research , 2006 .

[6]  Stefan Seuring,et al.  From a literature review to a conceptual framework for sustainable supply chain management , 2008 .

[7]  Hemanta Doloi,et al.  Understanding impacts of time and cost related construction risks on operational performance of PPP projects , 2012 .

[8]  Marcus Jefferies,et al.  A strategy for evaluating a fuzzy case-based construction procurement selection system , 2006, Adv. Eng. Softw..

[9]  Jurong Zheng,et al.  The Dynamics of Contractual and Relational Governance: Evidence From Long-Term Public-Private Procurement Arrangements , 2008 .

[10]  R. Pinto,et al.  Research in urban logistics: a systematic literature review , 2016 .

[11]  Peng Li,et al.  Selection of project delivery approach with unascertained model , 2015, Kybernetes.

[12]  Ojo Stephen Okunlola,et al.  Determining the Performance of Procurement Methods against Selection Criteria using Outranking-Satisfying Methodology , 2013 .

[13]  E. R. Yescombe Chapter 1 – What are Public–private Partnerships? , 2007 .

[14]  Jeff Zitron,et al.  Public–private partnership projects: Towards a model of contractor bidding decision-making , 2006 .

[15]  S. Thomas Ng,et al.  A case-based procurement advisory system for construction , 2003 .

[16]  T. Alhazmi,et al.  Project Procurement System Selection Model , 2000 .

[17]  Sai On Cheung,et al.  Improving objectivity in procurement selection , 2001 .

[18]  A. Chan,et al.  Critical review on PPP research : a search from the Chinese and international journals , 2016 .

[19]  John Tookey,et al.  Developing a procurement path determination chart SEM-based approach , 2015 .

[20]  Mark Konchar,et al.  Comparison of U.S. Project Delivery Systems , 1998 .

[21]  Mohan M. Kumaraswamy,et al.  Developing a decision support system for building project procurement , 2001 .

[22]  Keith R. Molenaar,et al.  MODEL FOR PUBLIC SECTOR DESIGN-BUILD PROJECT SELECTION , 1998 .

[23]  Binshan Lin,et al.  Project delivery system selection of construction projects in China , 2011, Expert Syst. Appl..

[24]  Weihua Yang,et al.  Two-stage decision-making method of PPP project model selection , 2012, 2012 IEEE International Conference on Computer Science and Automation Engineering.

[25]  Sergios Lambropoulos The use of time and cost utility for construction contract award under European Union Legislation , 2007 .

[26]  Elcio M. Tachizawa,et al.  Extending sustainability to suppliers: a systematic literature review , 2012 .

[27]  K. Verhoest,et al.  On the fast track? Using standard contracts in public–private partnerships for sports facilities: A case study , 2017 .

[28]  S. Wright,et al.  Europe Sees Mixed Results from Public-Private Partnerships for Building and Managing Health Care Facilities and Services , 2013, Health affairs.

[29]  Martin Oloruntobi Dada,et al.  Predictors of Procurement Selection: An Investigation of Traditional and Integrated Methods in Nigeria , 2012 .

[30]  Peter E.D. Love,et al.  Selecting a suitable procurement method for a building project , 1998 .

[31]  Chen-Yu Chang,et al.  Rethinking the multi-attribute utility approach based procurement route selection technique , 2002 .

[32]  Patrick T.I. Lam,et al.  Preferred risk allocation in Chinas publicprivate partnership (PPP) projects , 2010 .

[33]  S. Thomas Ng,et al.  Fuzzy membership functions of procurement selection criteria , 2002 .

[34]  Mohan M. Kumaraswamy,et al.  Comparing contributors to time and cost performance in building projects , 1998 .

[35]  C. William Ibbs,et al.  Alternative methods for choosing an appropriate project delivery system (PDS) , 2011 .

[36]  B. Quélin,et al.  Creating and Capturing Value in Public-Private Ties: A Private Actor's Perspective , 2011 .

[37]  Stuart D. Anderson,et al.  Relative Effectiveness of Project Delivery and Contract Strategies , 2006 .

[38]  Ibrahim M. Mahdi,et al.  Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP) , 2005 .

[39]  A. Akintoye,et al.  Critical success factors for PPP/PFI projects in the UK construction industry , 2005 .

[40]  Heap-Yih Chong,et al.  Improving construction procurement systems using organizational strategies , 2014 .

[41]  Mohammed I Al Khalil,et al.  Selecting the appropriate project delivery method using AHP , 2002 .

[42]  H. Walker,et al.  Theories in sustainable supply chain management: a structured literature review , 2015 .

[43]  Ali Mostafavi,et al.  Selecting Appropriate Project Delivery System: Fuzzy Approach with Risk Analysis , 2010 .

[44]  Min Liu,et al.  Using neural network to predict performance of design-build projects in Singapore , 2004 .

[45]  Chen-yu Chang,et al.  The principle of inconsistent trinity in the selection of procurement systems , 2007 .

[46]  Michael Riley,et al.  New Project Procurement Process , 2001 .

[47]  Peter E.D. Love,et al.  Participatory Action Research Approach to Public Sector Procurement Selection , 2012 .

[48]  S. Thomas Ng,et al.  Formulating Procurement Selection Criteria through Case-Based Reasoning Approach , 2005 .

[49]  Peter E.D. Love,et al.  Future Proofing PPPs: Life-Cycle Performance Measurement and Building Information Modelling , 2015 .

[50]  Ekambaram Palaneeswaran,et al.  Selection matters – in construction supply chain optimisation , 2000 .

[51]  N. Caldwell,et al.  Social Value Creation and Relational Coordination in Public‐Private Collaborations , 2017 .

[52]  Albert P.C. Chan,et al.  Framework of Success Criteria for Design/Build Projects , 2002 .

[53]  P. Hare PPP and PFI: the political economy of building public infrastructure and delivering services , 2013 .

[54]  E. R. Yescombe,et al.  Public-Private Partnerships: Principles of Policy and Finance , 2007 .