On pre-filling probability of flood control detention facilities

Flood control detention facilities are widely used for stormwater control in urban areas. Standard design procedures are in most cases based on the design storm approach: a single flood event at a time is considered, at the beginning of which the facility is assumed completely empty. The possibility of pre-filling from previous events is then neglected and underestimation of storage volume may occur. In this paper an analytical probabilistic approach to estimate the probability of pre-filling is presented and its effects, due to outflow rate and storage volume, are investigated. Two different strategies for the outlet control are analysed. Results are validated on a case study.

[1]  Harry G. Wenzel,et al.  Evaluation of the urban design storm concept , 1981 .

[2]  Wayne C. Huber,et al.  Hydrology and Floodplain Analysis , 1989 .

[3]  P. S. Eagleson Dynamics of flood frequency , 1972 .

[4]  Barry J. Adams,et al.  An analytical probabilistic approach to sizing flood control detention facilities , 1999 .

[5]  B. Adams,et al.  Urban Stormwater Management Planning with Analytical Probabilistic Models , 2000 .

[6]  G. V. Loganathan,et al.  Effects of Urbanization on Frequencies of Overflows and Pollutant Loadings From Storm Sewer Overflows: A Derived Distribution Approach , 1984 .

[7]  B. J. Adams,et al.  Meteorological Data Analysis for Drainage System Design , 1986 .

[8]  Baldassare Bacchi,et al.  Proposal of a semi-probabilistic approach for storage facility design , 2008 .

[9]  P E Shelley,et al.  Methodology for analysis of detention basins for control of urban runoff quality. Final report , 1986 .

[10]  Barry J. Adams,et al.  Hydrologic analysis of urban catchments with event‐based probabilistic models: 1. Runoff volume , 1998 .

[11]  A. Paoletti,et al.  Effects of management rules on pre-filling of stormwater detention facilities , 2011 .

[12]  Gianfranco Becciu,et al.  Evaluation of the Feasibility of Irrigation Storage in a Flood Detention Pond in an Agricultural Catchment in Northern Italy , 2011 .

[13]  Peter S. Eagleson,et al.  Climate, soil, and vegetation: 2. The distribution of annual precipitation derived from observed storm sequences , 1978 .

[14]  Yiping Guo,et al.  Hydrologic analysis of urban catchments with event‐based probabilistic models: 2. Peak discharge rate , 1998 .

[15]  Lawrence L. Kupper,et al.  Probability, statistics, and decision for civil engineers , 1970 .

[16]  A. Paoletti,et al.  Random characteristics of runoff coefficient in urban catchments , 1997 .

[17]  A. Paoletti,et al.  Moments of runoff coefficient and peak discharge estimation in urban catchments , 2000 .

[18]  A. Raimondi,et al.  Factors Affecting The Pre-filling Probability OfWater Storage Tanks , 2012 .