A three-phase integrated model for product configuration change problems

Requirements of engineers or customers may result in product configuration change with product life cycle; effective management of product configuration can actually enhance productivity and customer satisfaction. This study aims to develop a three-phase evaluation model incorporating fuzzy theory, value engineering and multi-criterion to find optimal strategies for product configuration change, so as to select suitable combination of parts suppliers. Genetic algorithm was used to solve the issue concerned with part change in a short time with part quality, cost, time and reliability as evaluation parameters. Finally, as a case study, the display module of a notebook was analyzed, the results indicate that the evaluation can be effectively applied in a large-scale product configuration change.

[1]  D. Wallace,et al.  Concurrent assembly planning with genetic algorithms , 2000 .

[2]  Mark A. Vonderembse,et al.  The Impact of Supplier Selection Criteria and Supplier Involvement on Manufacturing Performance , 1999 .

[3]  Kazem Abhary,et al.  A genetic algorithm for the optimisation of assembly sequences , 2006, Comput. Ind. Eng..

[4]  Vincent C. Yen,et al.  Rule selections in fuzzy expert systems , 1999 .

[5]  Hwai-En Tseng,et al.  Connector-based approach to assembly planning using a genetic algorithm , 2004 .

[6]  Samy E. G. Elias Value engineering, a powerful productivity tool , 1998 .

[7]  Laura Painton,et al.  Genetic algorithms in optimization of system reliability. , 1995 .

[8]  Zbigniew Michalewicz,et al.  Parameter control in evolutionary algorithms , 1999, IEEE Trans. Evol. Comput..

[9]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[10]  Ireneusz Karkowski,et al.  Architectural synthesis with possibilistic programming , 1995, Proceedings of the Twenty-Eighth Annual Hawaii International Conference on System Sciences.

[11]  Weijun Xia,et al.  Supplier selection with multiple criteria in volume discount environments , 2007 .

[12]  Shad Dowlatshahi,et al.  DESIGNER-BUYER-SUPPLIER INTERFACE: THEORY VERSUS PRACTICE , 2000 .

[13]  Wang Kan-liang Study on the Incentive Mechanism of Supplier Selection and Management , 2002 .

[14]  Gerhard Friedrich,et al.  Conceptual modeling for configuration of mass-customizable products , 2001, Artif. Intell. Eng..

[15]  Kunwoo Lee,et al.  A framework of collaborative design environment for injection molding , 2002, Comput. Ind..

[16]  Thomas L. DeFazio,et al.  Simplified generation of all mechanical assembly sequences , 1987, IEEE Journal on Robotics and Automation.

[17]  A. Ravi Ravindran,et al.  Vendor selection in outsourcing , 2007, Comput. Oper. Res..

[18]  A. Petroni,et al.  From Traditional Purchasing to Supplier Management: A Fuzzy Logic-based Approach to Supplier Selection , 2002 .

[19]  D. Towill,et al.  The impact of product life cycle on supply chain strategy , 2003 .

[20]  I. C. Wright,et al.  A review of research into engineering change management: implications for product design , 1997 .

[21]  Jeffery K. Cochran,et al.  Fuzzy multi-criteria selection of object-oriented simulation software for production system analysis , 2005, Comput. Oper. Res..

[22]  Xiao Liu,et al.  An optimised part-selection strategy in product reconfiguration design , 2005 .

[23]  Bin Li,et al.  Product configuration optimization using a multiobjective genetic algorithm , 2006 .

[24]  Kamel Rouibah,et al.  Change management in concurrent engineering from a parameter perspective , 2003, Comput. Ind..

[25]  Shin'ya Nagasawa Application of fuzzy theory to value engineering , 1997 .

[26]  Thomas V. Scannell,et al.  Success Factors for Integrating Suppliers into New Product Development , 1997 .

[27]  Z. H. Che,et al.  An integrated model for supplier selection decisions in configuration changes , 2007, Expert Syst. Appl..

[28]  C. Ou-Yang,et al.  Developing an Integrated Intelligent Framework to Support an Engineering Change Process for an Axial Piston Pump , 1999 .

[29]  Andrew A. West,et al.  A framework of web-based conceptual design , 2003, Comput. Ind..

[30]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[31]  Jing Li,et al.  Progressive engineering changes in multi-level product structures , 1997 .

[32]  Jim Browne,et al.  A decision support tool for planning bills-of-material , 1996 .

[33]  Beatrice Lazzerini,et al.  A genetic algorithm for generating optimal assembly plans , 2000, Artif. Intell. Eng..

[34]  Rong-Kwei Li,et al.  Manufacturing bill-of-material planning , 1997 .

[35]  Daniel Sabin,et al.  Product Configuration Frameworks - A Survey , 1998, IEEE Intell. Syst..

[36]  Zhang Jinsong,et al.  Configuration-oriented product modelling and knowledge management for made-to-order manufacturing enterprises , 2005 .

[37]  C. Swift Preferences for single sourcing and supplier selection criteria , 1995 .

[38]  Deng Shengchun Optimization of Components Suppliers' Selection Based on Association Rule , 2004 .

[39]  F. Bonneville,et al.  A genetic algorithm to generate and evaluate assembly plans , 1995, Proceedings 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory Automation. ETFA'95.