A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile
暂无分享,去创建一个
[1] H. Askari-Nasab,et al. Mixed integer linear programming formulations for open pit production scheduling , 2011 .
[2] R. Dimitrakopoulos,et al. Stochastic integer programming for optimising long term production schedules of open pit mines: methods, application and value of stochastic solutions , 2008 .
[3] H. Askari-Nasab,et al. Two-stage clustering algorithm for block aggregation in open pit mines , 2011 .
[4] Behrooz Karimi,et al. Long-term open pit mine production planning: a review of models and algorithms , 2008 .
[5] Clayton V. Deutsch,et al. GSLIB: Geostatistical Software Library and User's Guide , 1993 .
[6] Kwame Awuah-Offei,et al. Large-scale open pit production scheduling using Mixed Integer Linear Programming , 2010 .
[7] D. J. Farmer. Estimation of hoisting power requirements for friction and drum hoists for prefeasibility studies in Canada , 1997 .
[8] Lou Caccetta,et al. An Application of Branch and Cut to Open Pit Mine Scheduling , 2003, J. Glob. Optim..
[9] H. Askari-Nasab,et al. Transfer of Geological Uncertainty through Mine Planning , 2009 .
[10] L. M. Giannini. Optimum design of open pit mines , 1991, Bulletin of the Australian Mathematical Society.
[11] M. Vallee,et al. Mineral resource + engineering, economic and legal feasibility = ore reserve , 2000 .
[12] Roussos Dimitrakopoulos,et al. Stochastic optimisation model for open pit mine planning: application and risk analysis at copper deposit , 2007 .