Multi-agent evolutionary game in the recycling utilization of construction waste.

[1]  D. Friedman EVOLUTIONARY GAMES IN ECONOMICS , 1991 .

[2]  Gregory G. Dess,et al.  Linking Two Dimensions of Entrepreneurial Orientation to Firm Performance: The Moderating Role of Environment and Industry Life Cycle , 2001 .

[3]  Rawshan Ara Begum,et al.  A benefit–cost analysis on the economic feasibility of construction waste minimisation: The case of Malaysia , 2006 .

[4]  Vera Susanne Rotter,et al.  Evaluation of the economic feasibility for the recycling of construction and demolition waste in China—The case of Chongqing , 2010 .

[5]  O Ortiz,et al.  Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain. , 2010, Waste management.

[6]  Patrik Söderholm,et al.  Taxing virgin natural resources: Lessons from aggregates taxation in Europe☆ , 2011 .

[7]  Jorge de Brito,et al.  Economic viability analysis of a construction and demolition waste recycling plant in Portugal – part I: location, materials, technology and economic analysis , 2013 .

[8]  Weisheng Lu,et al.  Construction waste management policies and their effectiveness in Hong Kong: A longitudinal review , 2013 .

[9]  Research on Construction Waste Recycling Promblems and Corresponding Countermeasures in Chengdu , 2014 .

[10]  Waste generated in high-rise buildings construction: a quantification model based on statistical multiple regression. , 2015, Waste management.

[11]  Myoung-Hoon Jun,et al.  A comparison of economic feasibility and emission of carbon dioxide for two recycling processes , 2015 .

[12]  Ghang Lee,et al.  Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea. , 2016, Waste management.

[13]  M. Contreras,et al.  Recycling of construction and demolition waste for producing new construction material (Brazil case-study) , 2016 .

[14]  Jian Zuo,et al.  An innovative approach to managing demolition waste via GIS (geographic information system): a case study in Shenzhen city, China , 2016 .

[15]  I-L Engkvist,et al.  Perspectives on recycling centres and future developments. , 2016, Applied ergonomics.

[16]  Laís Peixoto Rosado,et al.  Comparison of scenarios for the integrated management of construction and demolition waste by life cycle assessment: A case study in Brazil , 2016, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[17]  Dilanthi Amaratunga,et al.  Capacity building for post disaster construction and demolition waste management: A case of Sri Lanka , 2016 .

[18]  Martin A. Nowak,et al.  Evolutionary dynamics on any population structure , 2016, Nature.

[19]  Volkan Arslan,et al.  Construction and Demolition Waste Recycling Plants Revisited: Management Issues☆ , 2017 .

[20]  Jun Zheng,et al.  Dynamic simulation analysis of a construction and demolition waste management model under penalty and subsidy mechanisms , 2017 .

[21]  Ruoyu Jin,et al.  An empirical study of perceptions towards construction and demolition waste recycling and reuse in China , 2017 .

[22]  H. Schoenberger,et al.  Construction and demolition waste best management practice in Europe , 2018, Resources, Conservation and Recycling.

[23]  Qinghua He,et al.  Estimating the environmental costs and benefits of demolition waste using life cycle assessment and willingness-to-pay: A case study in Shenzhen , 2018 .

[24]  Jingzheng Ren,et al.  Construction and demolition waste management in China through the 3R principle , 2018 .

[25]  Ying Peng,et al.  Analysis of the Evolution Game of Construction and Demolition Waste Recycling Behavior Based on Prospect Theory under Environmental Regulation , 2018, International journal of environmental research and public health.

[26]  Xuemei Li,et al.  Trend Analysis of Pakistan Railways Based on Industry Life Cycle Theory , 2018 .

[27]  J. Eyckmans,et al.  Downcycling versus recycling of construction and demolition waste: Combining LCA and LCC to support sustainable policy making. , 2018, Waste management.

[28]  C. Rogers,et al.  The complementary use of game theory for the circular economy: A review of waste management decision-making methods in civil engineering. , 2019, Waste management.

[29]  Juan Daniel Martínez,et al.  Carbon black recovery from waste tire pyrolysis by demineralization: Production and application in rubber compounding. , 2019, Waste management.

[30]  Jianguo Chen,et al.  Considerations for better construction and demolition waste management: Identifying the decision behaviors of contractors and government departments through a game theory decision-making model , 2019, Journal of Cleaner Production.

[31]  Changnv Zeng,et al.  Separation studies of concrete and brick from construction and demolition waste. , 2019, Waste management.

[32]  Weisheng Lu,et al.  Evaluating the effects of green building on construction waste management: A comparative study of three green building rating systems , 2019, Building and Environment.

[33]  Xinchun Li,et al.  Effectiveness research on the multi-player evolutionary game of coal-mine safety regulation in China based on system dynamics , 2019, Safety Science.

[34]  Daniel C W Tsang,et al.  Extended theory of planned behaviour for promoting construction waste recycling in Hong Kong. , 2019, Waste management.

[35]  Zhe Wang,et al.  Evolutionary game analysis on behavioral strategies of multiple stakeholders in E-waste recycling industry , 2020, Resources, Conservation and Recycling.

[36]  Yugang Niu,et al.  Input-to-State Stabilization of Interval Type-2 Fuzzy Systems Subject to Cyberattacks: An Observer-Based Adaptive Sliding Mode Approach , 2020, IEEE Transactions on Fuzzy Systems.

[37]  S. Ghaffar,et al.  Pathways to circular construction: An integrated management of construction and demolition waste for resource recovery , 2020 .

[38]  Hongping Yuan,et al.  Interactive decisions of the waste producer and the recycler in construction waste recycling , 2020 .

[39]  Bangzhu Zhu,et al.  The coordination of stakeholder interests in environmental regulation: Lessons from China’s environmental regulation policies from the perspective of the evolutionary game theory , 2020 .

[40]  Ruguo Fan,et al.  The impact of renewable portfolio standard on retail electricity market: A system dynamics model of tripartite evolutionary game , 2020, Energy Policy.

[41]  Vivian W. Y Tam,et al.  Stakeholders’ willingness to pay for the new construction and demolition waste landfill charge scheme in Shenzhen: A contingent valuation approach , 2020 .

[42]  S. Kalidindi,et al.  Environmental benefits of construction and demolition debris recycling: Evidence from an Indian case study using life cycle assessment , 2020 .

[43]  A. Petrillo,et al.  LCA of concrete with construction and demolition waste , 2020 .