Construction Waste Generation in the Iranian Building Industry

Building industry as one of the greatest industries in Iran comprises a significant share of waste generation in the country. Since a large quantity of the generated construction waste is buried due to the lack of a recycling protocol, it leads to an undesired waste of resources and causes severe environmental issues. This paper provides a study on the problem of material loss/construction waste in the Iranian Building Industry regarding the impact of relevant shortcomings in the stages of design, construction and supervision as the main phases of construction process. This paper includes the case studies from Isfahan, Mazandaran, Qazvin and Zanjan provinces, with a focus on the most important elements underlying construction waste generation. It also presents the experts points of view on prefab and conventional construction methods considering construction waste generation through a questionnaire-based survey. In general, the results show that Iranian project managers, engineers, contractors and workers believe that from 40 to 100 percent of construction wastes can be reduced via application of prefab construction methods. The results indicate that prefabrication can be considered as a solution to waste reduction in the Iranian Building Industry, whereas there is a dominant conventional method application in the industry.

[1]  Alireza Soffianian,et al.  GIS-Based Multi Criteria Evaluation for Thermal Power Plant Site Selection in Kahnuj County, SE Iran , 2017 .

[2]  Chi Sun Poon,et al.  Minimizing Construction and Demolition Waste at the Design Stage , 2002 .

[3]  Lukumon O. Oyedele,et al.  Reducing waste to landfill: A need for cultural change in the UK construction industry , 2016 .

[4]  Patrick X.W. Zou,et al.  An agent based environmental impact assessment of building demolition waste management: Conventional versus green management , 2016 .

[5]  E. R. Skoyles,et al.  Waste prevention on site , 1987 .

[6]  Ann T. W. Yu,et al.  On-site sorting of construction and demolition waste in Hong Kong , 2001 .

[7]  Vivian W. Y Tam,et al.  Critical factors in effective construction waste minimization at the design stage: A Shenzhen case study, China , 2014 .

[8]  Chi Sun Poon,et al.  Reducing building waste at construction sites in Hong Kong , 2004 .

[9]  Chi Sun Poon,et al.  Life cycle design and prefabrication in buildings: A review and case studies in Hong Kong , 2014 .

[10]  Andrew D.F. Price,et al.  Architect and contractor attitudes to waste minimisation , 2006 .

[11]  Vivian W. Y Tam,et al.  Designers’ attitude and behaviour towards construction waste minimization by design: A study in Shenzhen, China , 2015 .

[12]  Chi S. Poon,et al.  Management and Recycling of Demolition Waste in Hong Kong , 1997 .

[13]  Vivian W. Y Tam,et al.  Identifying best design strategies for construction waste minimization , 2015 .

[14]  Nilay Cosgun,et al.  A study conducted to reduce construction waste generation in Turkey , 2007 .

[15]  C. Poon Reducing construction waste. , 2007, Waste management.

[16]  Chi Sun Poon,et al.  Minimizing demolition wastes in Hong Kong public housing projects , 2004 .

[17]  Manal S. Abdelhamid,et al.  Assessment of different construction and demolition waste management approaches , 2014 .

[18]  Paola Villoria Sáez,et al.  Best practice measures assessment for construction and demolition waste management in building constructions , 2013 .

[19]  C S Poon,et al.  Management of construction and demolition waste. , 2007, Waste management.

[20]  Chi Sun Poon,et al.  Quantifying the Impact of Construction Waste Charging Scheme on Construction Waste Management in Hong Kong , 2013 .

[21]  Dorota Chwieduk,et al.  Towards sustainable-energy buildings , 2003 .

[22]  C S Poon,et al.  Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. , 2009, Waste management.

[23]  Andrew N. Baldwin,et al.  Modelling design information to evaluate pre-fabricated and pre-cast design solutions for reducing construction waste in high rise residential buildings , 2008 .

[24]  Vivian W. Y Tam,et al.  Implementation of environmental management in the Hong Kong construction industry , 2002 .

[25]  Hongping Yuan,et al.  Trend of the research on construction and demolition waste management. , 2011, Waste management.

[26]  Andrew N. Baldwin,et al.  A BIM-aided construction waste minimisation framework , 2015 .

[27]  Ghang Lee,et al.  Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea. , 2016, Waste management.