Experimental investigation on the accessing to equalpotential working method on 1000kV UHV compact transmission line

The safety operation of UHV transmission lines is important to the power grid and live working technology is a key method to cope with line components defects or fault without outage plan. In order to ensure the safety of live line workers and electrical equipment, the workers entering into equal-potential must select proper accessing path and satisfy the requirement of minimum complex gaps. Live line maintenance is difficult to conduct on the compact UHV transmission lines due to high tower, heavy line components and compact air gaps of tower windows. Several general methods of entering into equalpotential to work on a suspension tower of EHV/UHV transmission line were introduced in this paper. The safety of access into the tower windows were evaluated through a test at 1:1 ratio scale simulated tower and a mannequin simulating the workers at typical work position. And the discharge characteristics of live working complex gap were determined by the up and down methods of switching impulse voltage discharge. Test results show that the accessing to equal-potential method for suspension tower from the side of tower window and parallel to the line was recommended. It's minimum complex gap is 7.0 m. Meanwhile, the method of striding no more than two insulators along the tension string is adopted to enter into potential working on strain tower. It's minimum complex gap is 6.6 m.

[1]  Su Zhan-tao,et al.  Experimental Analysis of Live Working on 750 kV Compact Double Circuits Transmission Line on the Same Tower , 2010 .

[2]  Hu Jian-xun Live Working Ways for Compact Transmission Lines and Relevant Safety Protection , 2007 .

[3]  Neil Higgins,et al.  SMART GRID TECHNOLOGY , 2009 .

[4]  Wu Tian Experimental Research of Live Working on ±500 kV Double Circuit DC Transmission Line on the Same Tower , 2010 .

[5]  Shao Guiwei Research of Live Working on 750 kV Double Circuit AC Transmission Line , 2009 .

[6]  Liu Ting,et al.  Experimental Research of Live Working on 1000 kV Double Circuit AC Transmission Line on the Same Tower , 2010 .

[7]  Wang Linong Research of Live Working on 500 kV Compact Transmission Lines in High Altitude Area , 2005 .

[8]  Ting Liu,et al.  Research on Minimum Approach Distance for Live Working on 1000kV Ultra High Voltage AC Transmission Line , 2009, 2009 Asia-Pacific Power and Energy Engineering Conference.

[9]  Fan Ling-meng Analysis of Live Working on Yun-Guang ±800 kV DC Transmission Line , 2010 .

[10]  Wu Tian An Experimental Research of Living Work on High Altitude Compact 500 kV Transmission Line , 2010 .

[11]  Ting Liu,et al.  Research of Safety Protection for Live Working on 1000kV AC Ultra High Voltage Transmission Line , 2010, 2010 Asia-Pacific Power and Energy Engineering Conference.

[12]  Xiao Bin Analysis on Safety Protective Equipments for Live Working on±800kV UHV DC Transmission Line , 2010 .

[13]  Zhang Ya-peng An Experimental Investigation on Live Line Work for 750kV Transmission Line , 2006 .

[14]  Xiao Bin On-site Application Test of Live Working of UHV AC Transmission Line , 2009 .

[15]  Zhang Ya-peng Research on Combined Gap of Live Line Work for 750 kV Power Transmission Line , 2006 .