Comparison of two harvesting systems for the production of forest biomass from the thinning of Picea abies plantations

Abstract This study compares two principally different harvesting systems used for the thinning of Norway spruce [Picea abies (L.) Karst.] plantations in the Alps. The first system was whole-tree harvesting (WTH), producing only whole-tree chips for energy purposes. This system minimizes the production costs by simplifying the harvesting process. The other system was cut-to-length (CTL) mechanical harvesting with an excavator-based harvester. This system maximizes value recovery by producing both short sawlogs and quality fuel chips. Trials were conducted on two similar sites in the Dolomites, in northern Italy, and demonstrated that the CTL system resulted in slightly higher harvesting costs, and also higher revenue. The price differences between the different products determine which system offers the best economic results. If the delivered price of sawlogs does not exceed €25 t−1, WTH and CTL harvesting offer very similar economic performances, and become profitable only if the delivered price of raw chip wood exceeds €40 t−1. If the delivered price of sawlogs increases to €50 t−1, the mechanized CTL system always becomes preferable, and it will turn some profits when the price of raw biomass exceeds €35 t−1. The CTL system is less sensitive to long extraction and transport distances than the WTH system.

[1]  Bruce R. Hartsough,et al.  Testing Mobile Chippers for Chip Size Distribution , 2005 .

[2]  Jori Uusitalo,et al.  Time consumption analysis of the mechanized cut-to-length harvesting system , 2006 .

[3]  P. Rauch,et al.  Designing a regional forest fuel supply network , 2007 .

[4]  Hubert Sterba GROWTH AFTER BIOMASS REMOVAL DURING PRE-COMMERCIAL THINNING , 2003 .

[5]  Suraj P. Shrestha,et al.  Comparison of timber utilization between a tree-length and an in-wood chipping harvesting operations , 2002 .

[6]  Paula Jylhä Feasibility of an Adapted Tree Section Method for Integrated Harvesting of Pulpwood and Energy Wood in Early Thinning of Scots Pine , 2004 .

[7]  Juha Laitila,et al.  Harvesting Technology and the Cost of Fuel Chips from Early Thinnings , 2008 .

[8]  David B. Kittredge,et al.  Decreasing Woodlot Size and the Future of Timber Sales in Massachusetts: When Is an Operation Too Small? , 1996 .

[9]  Edwin S. Miyata,et al.  Determining fixed and operating costs of logging equipment. , 1980 .

[10]  Han-Sup Han,et al.  Productivity and cost of cut-to-length and whole-tree harvesting in a mixed-conifer stand , 2007 .

[11]  Borja Velázquez-Martí,et al.  Evaluation of two harvesting systems for the supply of wood-chips in Norway spruce forests affected by bark beetles , 2007 .

[12]  J. Connolly Comparative Cost Analysis , 1967, Journal of the Royal Aeronautical Society.

[13]  T. Gullberg,et al.  Evaluating Operator-Machine Interactions in Comparative Time Studies , 1995 .

[14]  Mark Rickenbach,et al.  Logging firms, nonindustrial private forests, and forest parcelization: evidence of firm specialization and its impact on sustainable timber supply , 2006 .

[15]  Kalle Kärhä,et al.  Mechanized Energy Wood Harvesting from Early Thinnings , 2005 .

[16]  Rien Visser,et al.  Analyzing and estimating delays in wood chipping operations. , 2009 .

[17]  Karl Stampfer,et al.  Regional energy wood logistics - optimizing local fuel supply. , 2009 .

[18]  J. Nurmi,et al.  The characteristics of whole-tree fuel stocks from silvicultural cleanings and thinnings , 2007 .

[19]  Jerry J. Kammenga Whole-Tree Utilization System for Thinning Young Douglas-Fir , 1983 .

[20]  Rolf Björheden,et al.  Learning Curves in Tree Section Hauling in Central Sweden , 2001 .

[21]  R. W. Brinker,et al.  Productivity of a Scandinavian cut-to-length system while second thinning pine plantations , 1993 .

[22]  R. Lundmark Cost structure of and competition for forest-based biomass , 2006 .

[23]  Tom Gallagher,et al.  Chipping whole trees for fuel chips: a production study , 2007 .

[24]  Metsäteho Oy,et al.  Productivity and Cutting Costs of Thinning Harvesters , 2004 .

[25]  Lauri Sikanen,et al.  Feasibility of Excavator-Based Harvester in Thinnings of Peatland Forests , 2004 .

[26]  Han-Sup Han,et al.  Economic feasibility of an integrated harvesting system for small-diameter trees in Southwest Idaho , 2004 .