Productivity Improvement by Value Stream Mapping in Die Casting Industry
暂无分享,去创建一个
[1] V. Ramesh,et al. Implementation of a Lean Model for Carrying out Value Stream Mapping in a Manufacturing Industry , 2008 .
[2] Sebastian Thiede,et al. Integrating Product Characteristics into Extended Value Stream Modeling , 2014 .
[3] Vivek A. Deshpande,et al. VALUE STREAM MAPPING: A CASE STUDY OF AUTOMOTIVE INDUSTRY , 2014 .
[4] R. M. Belokar,et al. AN APPLICATION OF VALUE STREAM MAPPING IN AUTOMOBILE INDUSTRY : A CASE STUDY 232 II , 2012 .
[5] A. R. Rahani,et al. Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study , 2012 .
[6] Binu Bose,et al. Reducing rejection rate of castings usingSimulation Model , 2013 .
[7] Shailesh Kumar,et al. Cycle Time Reduction of a Truck Body Assembly in an Automobile Industry by Lean Principles , 2014 .
[8] Improvement of Productivity Using Value Stream Mapping , 2014 .
[9] A. M. Saifuddoha,et al. Minimization of waste by applying value stream mapping in the supply chain of cement industry , 2013 .
[10] Jiwen Sun,et al. Simulation guided value stream mapping and lean improvement: A case study of a tubular machining facility , 2013 .
[11] Bojan Lalic,et al. Using Cost-time Profile for Value Stream Optimization , 2014 .
[12] Ahmed M. Deif,et al. Dynamic Lean Assessment for Takt Time Implementation , 2014 .
[13] Per Gullander,et al. Concepts for simulation based Value Stream Mapping , 2009, Proceedings of the 2009 Winter Simulation Conference (WSC).