Application of Supply Chain Performance Measurement in Scor Model at Building Project
暂无分享,去创建一个
[1] Jati Utomo Dwi Hatmoko,et al. Simulating the impact of supply chain management practice on the performance of medium‐sized building projects , 2010 .
[2] Liyin Shen,et al. Measuring the Networking Performance for Contractors in Practicing Construction Management , 2013 .
[3] Fredrik Persson. SCOR template—A simulation based dynamic supply chain analysis tool , 2011 .
[4] A. Akintoye,et al. A survey of supply chain collaboration and management in the UK construction industry , 2000 .
[5] Lauri Koskela,et al. The four roles of supply chain management in construction , 2000 .
[6] A. Wong,et al. Total quality management in the construction industry in Hong Kong: A supply chain management perspective , 1999 .
[7] Fredrik Persson,et al. The development of a dynamic supply chain analysis tool—Integration of SCOR and discrete event simulation , 2009 .
[8] Xiaodong Li,et al. An agent-based framework for supply chain coordination in construction , 2005 .
[9] M. Agung Wibowo,et al. The Analysis of Supply Chain Performance Measurement at Construction Project , 2015 .
[10] Hokey Min,et al. Supply chain modeling: past, present and future , 2002 .
[11] Johannes T. Voordijk,et al. Balanced framework for measuring performance of supply chains in house building , 2012 .
[12] H. Ping Tserng,et al. Developing a resource supply chain planning system for construction projects , 2006 .