Ramp Metering and Freeway Bottleneck Capacity

This study aims to determine whether ramp meters increase the capacity of active freeway bottlenecks. The traffic flow characteristics at 27 active bottlenecks in the Twin Cities have been studied for seven weeks without ramp metering and seven weeks with ramp metering. A methodology for systematically identifying active freeway bottlenecks in a metropolitan area is proposed, which relies on two occupancy threshold values and is compared to an established diagnostic method - transformed cumulative count curves. A series of hypotheses regarding the relationships between ramp metering and the capacity of active bottlenecks are developed and tested against empirical traffic data. It is found that meters increase the bottleneck capacity by postponing and sometimes eliminating bottleneck activations, accommodating higher flows during the pre-queue transition period, and increasing queue discharge flow rates after breakdown. Results also suggest that flow drops after breakdown and the percentage flow drops at various bottlenecks follow a normal distribution. The implications of these findings on the design of efficient ramp control strategies, as well as future research directions, are discussed.

[1]  M. Cassidy,et al.  Some traffic features at freeway bottlenecks , 1999 .

[2]  Javrns,et al.  Flow Processes at a Freeway Bottleneck , 2022 .

[3]  David M Levinson,et al.  Ramp Meters on Trial: Evidence from the Twin Cities Metering Holiday , 2006 .

[4]  David Matthew Levinson,et al.  Traffic Equilibration: The Case of the Twin Cities Ramp Meter Shut Off , 2002 .

[5]  M Koshi,et al.  CAPACITY OF SAGS AND TUNNELS ON JAPANESE MOTORWAYS , 1992 .

[6]  James H Banks,et al.  TWO-CAPACITY PHENOMENON AT FREEWAY BOTTLENECKS: A BASIS FOR RAMP METERING? , 1991 .

[7]  V F Hurdle,et al.  FREEWAY CAPACITY: DEFINITION AND MEASUREMENT ISSUES. HIGHWAY CAPACITY AND LEVEL OF SERVICE. PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON HIGHWAY CAPACITY, KARLSRUHE, GERMANY, 24-27 JULY 1991 , 1991 .

[8]  Markos Papageorgiou,et al.  COORDINATED AND INTEGRATED CONTROL OF MOTORWAY NETWORKS VIA NON-LINEAR OPTIMAL CONTROL , 2002 .

[9]  S. Shapiro,et al.  An Analysis of Variance Test for Normality (Complete Samples) , 1965 .

[10]  Adolf D May,et al.  TRAFFIC DETECTOR ERRORS AND DIAGNOSTICS , 1987 .

[11]  Michael J. Cassidy,et al.  Study of Traffic at a Freeway Merge and Roles for Ramp Metering , 2002 .

[12]  Sam Yagar,et al.  Exploration of the Breakdown Phenomenon in Freeway Traffic , 1998 .

[13]  V F Hurdle,et al.  FREEWAY CAPACITY: DEFINITION AND MEASUREMENT ISSUES , 1991 .

[14]  Nancy L. Nihan,et al.  DETECTING ERRONEOUS LOOP DETECTOR DATA IN A FREEWAY TRAFFIC MANAGEMENT SYSTEM , 1990 .

[15]  Michael J. Cassidy,et al.  Some observed details of freeway traffic evolution , 2001 .

[16]  David M Levinson,et al.  Optimal Freeway Ramp Control without Origin-Destination Information , 2004 .

[17]  Adolf D May Experimentation with Manual and Automatic Ramp Control , 1965 .

[18]  Fred L. Hall,et al.  FREEWAY CAPACITY DROP AND THE DEFINITION OF CAPACITY , 1991 .

[19]  Klaus Bogenberger,et al.  Advanced Coordinated Traffic Responsive Ramp Metering Strategies , 1999 .

[20]  David M Levinson,et al.  Estimation of the Demand Responses to Ramp Metering , 2002 .

[21]  Carlos F. Daganzo,et al.  Fundamentals of Transportation and Traffic Operations , 1997 .

[22]  Lei Zhang,et al.  Author ' s personal copy Ramp metering and freeway bottleneck capacity , 2010 .

[23]  Michael J. Cassidy,et al.  METHODOLOGY FOR ASSESSING DYNAMICS OF FREEWAY TRAFFIC FLOW , 1995 .

[24]  J. Banks THE TWO-CAPACITY PHENOMENON: SOME THEORETICAL ISSUES , 1991 .

[25]  Michael J. Cassidy,et al.  AN OBSERVED TRAFFIC PATTERN IN LONG FREEWAY QUEUES , 2001 .

[26]  David M Levinson,et al.  Estimation of Demand Response to Ramp Metering , 2002 .

[27]  Michael J. Cassidy Freeway On-Ramp Metering, Delay Savings, and Diverge Bottleneck , 2003 .

[28]  D. Levinson,et al.  Some Properties of Flows at Freeway Bottlenecks , 2004 .

[29]  Leonard Newman,et al.  FREEWAY RAMP CONTROL--WHAT IT CAN AND CANNOT DO , 1969 .

[30]  Lei Zhang Traffic Diversion Effect of Ramp Metering at Individual and System Levels , 2007 .

[31]  Sam Yagar,et al.  Breakdown-Related Capacity for Freeway with Ramp Metering , 2001 .