Fuzzy Optimization in Cost, Time and Quality Trade-off in Software Projects with Quality Obtained by Fuzzy Rule Base
暂无分享,去创建一个
[1] Nalina Suresh,et al. Project management with time, cost, and quality considerations , 1996 .
[2] Do Ba Khang,et al. Time, cost and quality trade-off in project management: a case study , 1999 .
[3] Khaled A El-Rayes,et al. Time-Cost-Quality Trade-Off Analysis for Highway Construction , 2005 .
[4] Abbas Afshar,et al. MULTI-OBJECTIVE OPTIMIZATION OF TIME-COST-QUALITY USING MULTI-COLONY ANT ALGORITHM , 2007 .
[5] Hamed R. Tareghian,et al. A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search , 2007, Appl. Math. Comput..
[6] H. Iranmanesh,et al. Finding Pareto Optimal Front for the Multi- Mode Time, Cost Quality Trade-off in Project Scheduling , 2008 .
[7] Quanyuan Feng,et al. Multi-Objective Optimization in Construction Project Based on a Hierarchical Subpopulation Particle Swarm Optimization Algorithm , 2008, 2008 Second International Symposium on Intelligent Information Technology Application.