Flow Management in Flexible Manufacturing Cells with Pipeline Operations
暂无分享,去创建一个
[1] P. Bruckner,et al. An efficient algorithm for the job-shop problem with two jobs , 1988 .
[2] Subhash C. Sarin,et al. A structure for sequencing robot activities in machine tending applications , 1985 .
[3] Alessandro Agnetis,et al. Tool handling synchronization in flexible manufacturing cells , 1991, Proceedings. 1991 IEEE International Conference on Robotics and Automation.
[4] George L. Nemhauser,et al. A Geometric Model and a Graphical Algorithm for a Sequencing Problem , 1963 .
[5] Alessandro Agnetis,et al. Modelling and optimization of a flexible pipeline assembly system , 1990 .
[6] Y. Sotskov,et al. The complexity of shop-scheduling problems with two or three jobs , 1991 .
[7] Nils J. Nilsson,et al. A Formal Basis for the Heuristic Determination of Minimum Cost Paths , 1968, IEEE Trans. Syst. Sci. Cybern..
[8] Min-Hong Han,et al. Real-time tool control and job dispatching in flexible manufacturing systems , 1989 .
[9] G Grzegorz Reyman. Design of assembly systems , 1987 .