Towards a Performance Measurement System for Lean-Oriented NPD Processes

Lean thinking has been successfully applied to manufacturing and operations environments and many case studies and research papers have extensively been published. The same remark cannot be made for lean application to the New Product Development (NPD) process. Some efforts in Lean Product Development exist, but, until today, with the tools available, it is impossible to say if a NPD process is lean or not, and actually how much lean is. A kind of gap exists in the applicability of lean into the NPD process and this chapter aims at filling this gap, contributing to NPD performance measurement getting a leanness process. The paper proposes a Performance Measurement System, derived from the Balanced Scorecard approach, for measuring a NPD and its leanness. The proposed framework is under development within the LeanPPD European project.

[1]  Paul Humphreys,et al.  A web-based supplier evaluation tool for the product development process , 2005, Ind. Manag. Data Syst..

[2]  Kulwant S. Pawar,et al.  Measuring product development performance in manufacturing organisations , 2000 .

[3]  Jan Bilderbeek,et al.  R&D Performance Measurement: More than Choosing a Set of Metrics , 1997 .

[4]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[5]  Steven A. Melnyk,et al.  Metrics and performance measurement in operations management: dealing with the metrics maze , 2004 .

[6]  Tsu-Ming Yeh,et al.  Performance measurement for new product development: a model based on total costs , 2006 .

[7]  Brian H. Maskell,et al.  Performance Measurement for World Class Manufacturing: A Model for American Companies , 1991 .

[8]  R. Kaplan,et al.  The Balanced Scorecard: Translating Strategy into Action , 1996 .

[9]  Steve Kerr The best-laid incentive plans. , 2003, Harvard business review.

[10]  U. Bititci Modelling of performance measurement systems in manufacturing enterprises , 1995 .

[11]  Mohamed Zairi The integration of benchmarking and BPR , 1995 .

[12]  Karl T. Ulrich,et al.  Product Design and Development , 1995 .

[13]  Thomas L. Saaty,et al.  Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .

[14]  Bill Nixon,et al.  Evaluating design performance , 1999 .

[15]  D. Sinclair,et al.  Business process re‐engineering and process management , 1995 .

[16]  Robert S. Kaplan,et al.  The evolution of management accounting , 1984 .

[17]  Mike Saren,et al.  A classification and review of models of the intra-firm innovation process , 1984 .

[18]  A. Sivathanu Pillai,et al.  Performance measurement of R&D projects in a multi-project, concurrent engineering environment , 2002 .

[19]  R. Cooper,et al.  Maximizing Productivity in Product Innovation , 2008 .

[20]  A. Griffin,et al.  An Interim Report on Measuring Product Development Success and Failure , 1993 .

[21]  Kelvin F. Cross,et al.  The “SMART” way to define and sustain success , 1988 .

[22]  Mohan V. Tatikonda,et al.  Successful execution of product development projects: Balancing firmness and flexibility in the innovation process , 2000 .

[23]  A. Neely,et al.  The performance prism in practice , 2001 .

[24]  Morgan Swink,et al.  Completing projects on-time: how project acceleration affects new product development , 2003 .

[25]  Donald J. Bowersox,et al.  Materials Logistics Management , 1985 .

[26]  Jeffrey K. Liker,et al.  The Toyota Product Development System: Integrating People, Process And Technology , 2006 .

[27]  R. Cooper,et al.  New Products: What Separates Winners from Losers? , 1987 .

[28]  Henry Mintzberg,et al.  The Structuring of Organizations , 1979 .